IAC Assessment: MZ0338
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0338
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2023
Principal Product frozen baked goods
NAICS 311211 - Flour Milling
SIC 2041 - Flour And Other Grain Mill Products
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 504,000
Annual Production 650,000,000 Pounds
Production Hrs. Annual 8,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,183,240 128,675,640 kWh $0.03
Electricity Demand $1,932,549 118,867 kW-months/year $16.26
Natural Gas $437,553 57,337 MMBtu $7.63
TOTAL ENERGY COSTS $6,742,048
RECOMMENDED SAVINGS* $648,889 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,703
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$576,991
Cost:
$4,487,250
$335,042 10,152,786 $241,949 14,880 $335,042
10,152,786
kWh
$241,949
14,880
kW-months/year
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$2,823
Cost:
$860
$1,490 45,178 $1,333 82 $1,490
45,178
kWh
$1,333
82
kW-months/year
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,124
Cost:
$3,920
$2,124 64,366 - - $2,124
64,366
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$60,112
Cost:
$127,747
$60,112 1,821,609 - - $60,112
1,821,609
kWh
-
-
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,644
Cost:
$13,800
$2,693 81,600 $1,951 120 $2,693
81,600
kWh
$1,951
120
kW-months/year
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,195
Cost:
$240
$244 7,387 $1,951 120 $244
7,387
kWh
$1,951
120
kW-months/year
TOTAL RECOMMENDED Savings:
$648,889
Cost:
$4,633,817
$401,705 12,172,926 $247,184 15,202 $401,705
12,172,926
kWh
$247,184
15,202
kW-months/year
TOTAL IMPLEMENTED Savings:
$69,703
Cost:
$146,327
$66,419 2,012,753 $3,284 202 $66,419
2,012,753
kWh
$3,284
202
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand