IAC logo
IAC Assessment: MZ0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2023
Principal Product Packaged Turkey Products
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 250,000
Annual Production 2,500,000 Units
Production Hrs. Annual 4,160
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,878,403 39,522,000 kWh $0.05
Electricity Demand $304,956 97,742 kW-months/year $3.12
Electricity Fees $65,599 - $ -
Natural Gas $974,565 115,040 MMBtu $8.47
TOTAL ENERGY COSTS $3,223,523
RECOMMENDED SAVINGS* $47,662 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,080
Cost:
$9,000
- - $18,080 5,795 - - - - -
-
kWh
$18,080
5,795
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$13,839
Cost:
$3,000
- - - - $13,959 1,648 $(-120) - -
-
kWh
-
-
kW-months/year
$13,959
1,648
MMBtu
$(-120)
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$12,536
Cost:
$16,400
- - - - $12,536 1,480 - - -
-
kWh
-
-
kW-months/year
$12,536
1,480
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,207
Cost:
$160
$2,942 61,943 $265 85 - - - - $2,942
61,943
kWh
$265
85
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$47,662
Cost:
$28,560
$2,942 61,943 $18,345 5,880 $26,495 3,128 $(-120) - $2,942
61,943
kWh
$18,345
5,880
kW-months/year
$26,495
3,128
MMBtu
$(-120)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes