IAC logo
IAC Assessment: MZ0346
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0346
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2023
Principal Product Cable trays
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 72,000
Annual Production 351,000 Pieces
Production Hrs. Annual 4,160
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,133 721,600 kWh $0.11
Electricity Demand $17,821 1,947 kW-months/year $9.15
Natural Gas $8,466 737 MMBtu $11.49
TOTAL ENERGY COSTS $107,098
RECOMMENDED SAVINGS* $13,411 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $971
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$825
Cost:
$2,925
$188 1,710 $191 21 $446 - $188
1,710
kWh
$191
21
kW-months/year
$446
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$967
Cost:
$320
$780 7,089 $187 21 - - $780
7,089
kWh
$187
21
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,048
Cost:
$6,536
$11,048 93,442 - - - - $11,048
93,442
kWh
-
-
kW-months/year
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$425
Cost:
$485
$343 3,120 $82 9 - - $343
3,120
kWh
$82
9
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$146
Cost:
$200
$146 1,331 - - - - $146
1,331
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$13,411
Cost:
$10,466
$12,505 106,692 $460 51 $446 - $12,505
106,692
kWh
$460
51
kW-months/year
$446
-
$
TOTAL IMPLEMENTED Savings:
$971
Cost:
$3,125
$334 3,041 $191 21 $446 - $334
3,041
kWh
$191
21
kW-months/year
$446
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost