IAC Assessment: MZ0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2023
Principal Product drawn wire
NAICS 331222 - Steel Wire Drawing
SIC 3315 - Steel Wire And Related Products
Sales $100,000,000-$500,000,000
# of Employees 149
Plant Area (Sq.Ft.) 330,000
Annual Production 140,714 Tons
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,988,745 27,990,800 kWh $0.07
Electricity Demand $647,925 74,664 kW-months/year $8.68
Natural Gas $1,940,353 469,012 MMBtu $4.14
TOTAL ENERGY COSTS $4,650,176
RECOMMENDED SAVINGS* $135,324 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,043
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$60,563
Cost:
$285,000
$60,563 833,009 - - - - $60,563
833,009
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$9,825
Cost:
$7,940
$9,825 138,378 - - - - $9,825
138,378
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$860
Cost:
$750
$860 12,110 - - - - $860
12,110
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$17,125
Cost:
$42,980
$12,828 180,675 $4,297 495 - - $12,828
180,675
kWh
$4,297
495
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,922
Cost:
$78,200
- - - - $15,922 3,846 -
-
kWh
-
-
kW-months/year
$15,922
3,846
MMBtu
06: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$29,986
Cost:
$2,880
- - - - $29,986 7,243 -
-
kWh
-
-
kW-months/year
$29,986
7,243
MMBtu
07: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$1,043
Cost:
$320
$893 12,581 $150 17 - - $893
12,581
kWh
$150
17
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$135,324
Cost:
$418,070
$84,969 1,176,753 $4,447 512 $45,908 11,089 $84,969
1,176,753
kWh
$4,447
512
kW-months/year
$45,908
11,089
MMBtu
TOTAL IMPLEMENTED Savings:
$1,043
Cost:
$320
$893 12,581 $150 17 - - $893
12,581
kWh
$150
17
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas