IAC Assessment: MZ0361
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2024
Principal Product internal combustion engines
NAICS 333618 - Other Engine Equipment Manufacturing
SIC 3519 - Internal Combustion Engines, Nec
Sales $100,000,000-$500,000,000
# of Employees 869
Plant Area (Sq.Ft.) 973,172
Annual Production 979,021 Pieces
Production Hrs. Annual 5,912
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,621,332 30,995,286 kWh $0.05
Electricity Demand $905,510 77,866 kW-months/year $11.63
Natural Gas $642,932 122,461 MMBtu $5.25
TOTAL ENERGY COSTS $3,238,629
RECOMMENDED SAVINGS* $525,351 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Usage One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,633
Cost:
$6,555
$1,121 21,556 $512 44 - - - - - - $1,121
21,556
kWh
$512
44
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,784
Cost:
$1,000
$3,981 76,559 $1,803 155 - - - - - - $3,981
76,559
kWh
$1,803
155
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$13,797
Cost:
$4,800
- - - - $13,797 2,628 - - - - -
-
kWh
-
-
kW-months/year
$13,797
2,628
MMBtu
-
-
Tgal
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,158
Cost:
$1,750
$2,158 41,504 - - - - - - - - $2,158
41,504
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,374
Cost:
$117,036
$6,533 125,630 $3,489 300 - - - - $10,352 - $6,533
125,630
kWh
$3,489
300
kW-months/year
-
-
MMBtu
-
-
Tgal
$10,352
-
$
06: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$45,827
Cost:
$6,720
- - - - $45,827 8,729 - - - - -
-
kWh
-
-
kW-months/year
$45,827
8,729
MMBtu
-
-
Tgal
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,882
Cost:
$33,744
$41,882 805,430 - - - - - - - - $41,882
805,430
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$71,580
Cost:
$385,388
- - - - - - $71,580 9,061 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$71,580
9,061
Tgal
-
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$322,316
Cost:
$3,602,500
$322,316 6,198,386 - - - - - - - - $322,316
6,198,386
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$525,351
Cost:
$4,159,493
$377,991 7,269,065 $5,804 499 $59,624 11,357 $71,580 9,061 $10,352 - $377,991
7,269,065
kWh
$5,804
499
kW-months/year
$59,624
11,357
MMBtu
$71,580
9,061
Tgal
$10,352
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Usage One-time Revenue or Avoided Cost