Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2024
Principal Product Overmold and seat support, Flex mat and seat backs
NAICS 332613 - Spring Manufacturing
SIC 3493 - Steel Springs, Except Wire
Sales $10,000,000-$50,000,000
# of Employees 285
Plant Area (Sq.Ft.) 109,000
Annual Production 6,500 Tons
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $703,379 10,333,200 kWh $0.07
Electricity Demand $314,220 20,746 kW-months/year $15.15
Electricity Fees $13,321 - $ -
Natural Gas $108,915 7,521 MMBtu $14.48
TOTAL ENERGY COSTS $1,139,835
RECOMMENDED SAVINGS* $91,096 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$68,717
Cost:
$580,125
$68,717 1,009,055 - - - - $68,717
1,009,055
kWh
-
-
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,670
Cost:
$29,120
$6,666 97,878 $4,004 264 - - $6,666
97,878
kWh
$4,004
264
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,485
Cost:
$2,460
$4,815 70,708 $1,470 97 $(-800) - $4,815
70,708
kWh
$1,470
97
kW-months/year
$(-800)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,224
Cost:
$7,680
$4,770 70,044 $1,454 96 - - $4,770
70,044
kWh
$1,454
96
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$91,096
Cost:
$619,385
$84,968 1,247,685 $6,928 457 $(-800) - $84,968
1,247,685
kWh
$6,928
457
kW-months/year
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes