IAC Assessment: MZ0373
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0373
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2025
Principal Product varied plastic parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 143
Plant Area (Sq.Ft.) 58,500
Annual Production 2,333,779,000 Pieces
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,109,551 15,462,647 kWh $0.07
TOTAL ENERGY COSTS $1,119,876
RECOMMENDED SAVINGS* $84,263 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage One-time Revenue or Avoided Cost Electricity Usage One-time Revenue or Avoided Cost
$ kWh $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,877
Cost:
$6,000
$3,877 54,004 - - $3,877
54,004
kWh
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,710
Cost:
$120
$1,710 23,834 - - $1,710
23,834
kWh
-
-
$
03: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$2,122
Cost:
$500
$2,122 29,565 - - $2,122
29,565
kWh
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$17,800
Cost:
$5,600
$17,800 247,880 - - $17,800
247,880
kWh
-
-
$
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$16,241
Cost:
$120,000
$16,241 226,200 - - $16,241
226,200
kWh
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$155
Cost:
-
$155 2,156 - - $155
2,156
kWh
-
-
$
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,825
Cost:
-
$2,825 39,360 - - $2,825
39,360
kWh
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$38,188
Cost:
$16,280
$38,188 531,780 - - $38,188
531,780
kWh
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$463
Cost:
$948
$306 4,269 $157 - $306
4,269
kWh
$157
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$882
Cost:
$1,200
$882 12,106 - - $882
12,106
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$84,263
Cost:
$150,648
$84,106 1,171,154 $157 - $84,106
1,171,154
kWh
$157
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage One-time Revenue or Avoided Cost Electricity Usage One-time Revenue or Avoided Cost