IAC logo
IAC Assessment: MZ0374
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0374
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2025
Principal Product Air filters
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569 - General Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 162
Plant Area (Sq.Ft.) 56,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,811 2,964,806 kWh $0.07
Electricity Demand $105,610 6,207 kW-months/year $17.01
Natural Gas $21,187 1,935 MMBtu $10.95
TOTAL ENERGY COSTS $330,552
RECOMMENDED SAVINGS* $24,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,642
Cost:
$3,212
$1,642 24,143 - - - - - - $1,642
24,143
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$4,818
Cost:
$13,380
- - - - $4,818 440 - - -
-
kWh
-
-
kW-months/year
$4,818
440
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$165
Cost:
$415
$165 2,420 - - - - - - $165
2,420
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,170
Cost:
$7,950
$10,170 149,568 - - - - - - $10,170
149,568
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,884
Cost:
$4,020
$1,390 20,436 $494 29 - - - - $1,390
20,436
kWh
$494
29
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,683
Cost:
$8,662
$1,938 28,501 $955 56 - - $2,790 - $1,938
28,501
kWh
$955
56
kW-months/year
-
-
MMBtu
$2,790
-
$
TOTAL RECOMMENDED Savings:
$24,362
Cost:
$37,639
$15,305 225,068 $1,449 85 $4,818 440 $2,790 - $15,305
225,068
kWh
$1,449
85
kW-months/year
$4,818
440
MMBtu
$2,790
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost