Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1995 |
Principal Product | Cotton Yarn |
NAICS | n/a |
SIC | 2281 - Yarn Spinning Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 121 |
Plant Area (Sq.Ft.) | 226,000 |
Annual Production | 26,500,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,454,736 | 29,864,596 | kWh | $0.05 |
TOTAL ENERGY COSTS | $1,550,736 | |||
RECOMMENDED SAVINGS* | $186,682 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $58,204 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,340 Cost: - |
$3,340 | 68,288 | - | - | - | - |
$3,340 68,288 kWh |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $802 Cost: $450 |
$802 | 16,413 | - | - | - | - |
$802 16,413 kWh |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING |
Savings: $95,329 Cost: $560,000 |
$95,329 | 1,331,477 | - | - | - | - |
$95,329 1,331,477 kWh |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $14,062 Cost: $1,540 |
$14,062 | 230,657 | - | - | - | - |
$14,062 230,657 kWh |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM |
Savings: $6,149 Cost: $7,500 |
$6,149 | 229,484 | - | - | - | - |
$6,149 229,484 kWh |
- - Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $27,000 Cost: $6,000 |
- | - | $27,000 | 9,000,000 | - | - |
- - kWh |
$27,000 9,000,000 Tgal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $40,000 Cost: - |
- | - | - | - | $40,000 | 2,000,000 |
- - kWh |
- - Tgal |
$40,000 2,000,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $186,682 Cost: $575,490 |
$119,682 | 1,876,319 | $27,000 | 9,000,000 | $40,000 | 2,000,000 | $119,682 1,876,319 kWh |
$27,000 9,000,000 Tgal |
$40,000 2,000,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $58,204 Cost: $1,990 |
$18,204 | 315,358 | - | - | $40,000 | 2,000,000 | $18,204 315,358 kWh |
- - Tgal |
$40,000 2,000,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Water Disposal | Solid Waste (non-haz) |