Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1995 |
Principal Product | Blue Jeans for Children and Clothing for the US Navy |
NAICS | n/a |
SIC | 2325 - Men's and Boys' Separate Trousers and Slacks |
Sales | $5,000,000-$10,000,000 |
# of Employees | 154 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 600,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $122,640 | 1,055,686 | kWh | $0.12 |
Fuel Oil #2 | $5,100 | 1,190 | MMBtu | $4.29 |
TOTAL ENERGY COSTS | $130,043 | |||
RECOMMENDED SAVINGS* | $45,858 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,184 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Fuel Oil #2 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,418 Cost: $540 |
$2,418 | 13,775 | - | - | - | - |
$2,418 13,775 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $476 Cost: $700 |
$476 | 2,638 | - | - | - | - |
$476 2,638 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $237 Cost: $600 |
- | - | $237 | 55 | - | - |
- - kWh |
$237 55 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $641 Cost: $492 |
$641 | 4,103 | - | - | - | - |
$641 4,103 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $14,226 Cost: $11,650 |
$14,226 | 114,009 | - | - | - | - |
$14,226 114,009 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $25,557 Cost: $45,581 |
$32,716 | 391,266 | $(-7,159) | (-1,669) | - | - |
$32,716 391,266 kWh |
$(-7,159) (-1,669) MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $2,250 Cost: - |
- | - | - | - | $2,250 | 225,000 |
- - kWh |
- - MMBtu |
$2,250 225,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $53 Cost: - |
- | - | - | - | $53 | 5,312 |
- - kWh |
- - MMBtu |
$53 5,312 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,858 Cost: $59,563 |
$50,477 | 525,791 | $(-6,922) | (-1,614) | $2,303 | 230,312 | $50,477 525,791 kWh |
$(-6,922) (-1,614) MMBtu |
$2,303 230,312 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,184 Cost: $1,840 |
$2,894 | 16,413 | $237 | 55 | $53 | 5,312 | $2,894 16,413 kWh |
$237 55 MMBtu |
$53 5,312 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Fuel Oil #2 | Solid Waste (non-haz) |