IAC Assessment: NC0070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1995
Principal Product Contract Manufacturing
NAICS n/a
SIC 3490 -
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 42,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,860 1,664,420 kWh $0.07
TOTAL ENERGY COSTS $123,860
RECOMMENDED SAVINGS* $15,446 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,358
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,358
Cost:
$360
$1,358 19,930 - - $1,358
19,930
kWh
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,703
Cost:
$1,348
$1,703 30,188 - - $1,703
30,188
kWh
-
-
lb
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$634
Cost:
$1,600
$634 4,689 - - $634
4,689
kWh
-
-
lb
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$5,380
Cost:
$9,000
$5,380 99,648 - - $5,380
99,648
kWh
-
-
lb
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,371
Cost:
$3,525
$2,371 34,877 - - $2,371
34,877
kWh
-
-
lb
06: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$4,000
Cost:
$10,000
- - $4,000 8,000 -
-
kWh
$4,000
8,000
lb
TOTAL RECOMMENDED Savings:
$15,446
Cost:
$25,833
$11,446 189,332 $4,000 8,000 $11,446
189,332
kWh
$4,000
8,000
lb
TOTAL IMPLEMENTED Savings:
$1,358
Cost:
$360
$1,358 19,930 - - $1,358
19,930
kWh
-
-
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)