IAC logo
IAC Assessment: NC0089
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0089
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1996
Principal Product Electric resistance heaters
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 386,500
Annual Production 700,000 Pieces
Production Hrs. Annual 3,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,907 4,923,212 kWh $0.03
Electricity Demand $154,753 14,329 kW-months/year $10.80
Natural Gas $143,205 28,304 MMBtu $5.06
TOTAL ENERGY COSTS $460,865
RECOMMENDED SAVINGS* $29,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,763
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,208
Cost:
$690
$509 15,240 $699 65 - - - - - - - - - - $509
15,240
kWh
$699
65
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$761
Cost:
-
$761 23,154 - - - - - - - - - - - - $761
23,154
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,464
Cost:
$260
$511 15,533 $953 88 - - - - - - - - - - $511
15,533
kWh
$953
88
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$1,007
Cost:
$2,000
- - - - $1,007 199 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,007
199
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$17,555
Cost:
$140,000
$2,342 70,633 - - - - - - $21,390 56,256 $(-12,866) - $6,689 - $2,342
70,633
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$21,390
56,256
lb
$(-12,866)
-
$
$6,689
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$7,200
Cost:
$100
- - - - - - $7,200 560,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,200
560,000
lb
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,195
Cost:
$143,050
$4,123 124,560 $1,652 153 $1,007 199 $7,200 560,000 $21,390 56,256 $(-12,866) - $6,689 - $4,123
124,560
kWh
$1,652
153
kW-months/year
$1,007
199
MMBtu
$7,200
560,000
lb
$21,390
56,256
lb
$(-12,866)
-
$
$6,689
-
$
TOTAL IMPLEMENTED Savings:
$18,763
Cost:
$140,690
$2,851 85,873 $699 65 - - - - $21,390 56,256 $(-12,866) - $6,689 - $2,851
85,873
kWh
$699
65
kW-months/year
-
-
MMBtu
-
-
lb
$21,390
56,256
lb
$(-12,866)
-
$
$6,689
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Primary Raw Material Ancillary Material Cost