Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1996 |
Principal Product | Electric resistance heaters |
NAICS | n/a |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 386,500 |
Annual Production | 700,000 Pieces |
Production Hrs. Annual | 3,000 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $162,907 | 4,923,212 | kWh | $0.03 |
Electricity Demand | $154,753 | 14,329 | kW-months/year | $10.80 |
Natural Gas | $143,205 | 28,304 | MMBtu | $5.06 |
TOTAL ENERGY COSTS | $460,865 | |||
RECOMMENDED SAVINGS* | $29,195 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,763 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,208 Cost: $690 |
$509 | 15,240 | $699 | 65 | - | - | - | - | - | - | - | - | - | - |
$509 15,240 kWh |
$699 65 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $761 Cost: - |
$761 | 23,154 | - | - | - | - | - | - | - | - | - | - | - | - |
$761 23,154 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,464 Cost: $260 |
$511 | 15,533 | $953 | 88 | - | - | - | - | - | - | - | - | - | - |
$511 15,533 kWh |
$953 88 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2447 HEAT WATER WITH EXHAUST HEAT |
Savings: $1,007 Cost: $2,000 |
- | - | - | - | $1,007 | 199 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,007 199 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $17,555 Cost: $140,000 |
$2,342 | 70,633 | - | - | - | - | - | - | $21,390 | 56,256 | $(-12,866) | - | $6,689 | - |
$2,342 70,633 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$21,390 56,256 lb |
$(-12,866) - $ |
$6,689 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $7,200 Cost: $100 |
- | - | - | - | - | - | $7,200 | 560,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,200 560,000 lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,195 Cost: $143,050 |
$4,123 | 124,560 | $1,652 | 153 | $1,007 | 199 | $7,200 | 560,000 | $21,390 | 56,256 | $(-12,866) | - | $6,689 | - | $4,123 124,560 kWh |
$1,652 153 kW-months/year |
$1,007 199 MMBtu |
$7,200 560,000 lb |
$21,390 56,256 lb |
$(-12,866) - $ |
$6,689 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,763 Cost: $140,690 |
$2,851 | 85,873 | $699 | 65 | - | - | - | - | $21,390 | 56,256 | $(-12,866) | - | $6,689 | - | $2,851 85,873 kWh |
$699 65 kW-months/year |
- - MMBtu |
- - lb |
$21,390 56,256 lb |
$(-12,866) - $ |
$6,689 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Primary Raw Material | Ancillary Material Cost |