Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1997 |
Principal Product | Valve stems |
NAICS | n/a |
SIC | 3494 - Valves And Pipe Fittings, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 483 |
Plant Area (Sq.Ft.) | 325,000 |
Annual Production | 135,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $638,079 | 21,275,499 | kWh | $0.03 |
Electricity Demand | $459,197 | 44,669 | kW-months/year | $10.28 |
Electricity Fees | $13,607 | - | $ | - |
Natural Gas | $248,108 | 53,663 | MMBtu | $4.62 |
TOTAL ENERGY COSTS | $1,361,871 | |||
RECOMMENDED SAVINGS* | $40,031 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,391 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $21,668 Cost: $17,363 |
- | - | - | - | $21,668 | 4,690 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$21,668 4,690 MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,149 Cost: $320 |
$696 | 21,981 | $453 | 44 | - | - | - | - | - | - | - | - |
$696 21,981 kWh |
$453 44 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $6,190 Cost: $2,765 |
- | - | - | - | $6,190 | 1,320 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,190 1,320 MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,108 Cost: $4,000 |
$(-291) | (-9,379) | $(-163) | (-16) | $1,562 | 333 | - | - | - | - | - | - |
$(-291) (-9,379) kWh |
$(-163) (-16) kW-months/year |
$1,562 333 MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $726 Cost: $120 |
$481 | 17,585 | $245 | 24 | - | - | - | - | - | - | - | - |
$481 17,585 kWh |
$245 24 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $848 Cost: $299 |
- | - | - | - | $848 | 115 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$848 115 MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS |
Savings: $391 Cost: - |
- | - | - | - | - | - | - | - | $391 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$391 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS |
Savings: $2,191 Cost: $2,000 |
- | - | - | - | - | - | $720 | 4,000 | $1,471 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$720 4,000 lb |
$1,471 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $5,760 Cost: $9,150 |
- | - | - | - | - | - | - | - | - | - | $5,760 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$5,760 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,031 Cost: $36,017 |
$886 | 30,187 | $535 | 52 | $30,268 | 6,458 | $720 | 4,000 | $1,862 | - | $5,760 | - | $886 30,187 kWh |
$535 52 kW-months/year |
$30,268 6,458 MMBtu |
$720 4,000 lb |
$1,862 - $ |
$5,760 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,391 Cost: $18,102 |
$1,177 | 39,566 | $698 | 68 | $22,516 | 4,805 | - | - | - | - | - | - | $1,177 39,566 kWh |
$698 68 kW-months/year |
$22,516 4,805 MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Increase in Production |