IAC logo
IAC Assessment: NC0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1997
Principal Product Textile machinery parts, automotive parts, gas grills
NAICS n/a
SIC 3490 -
Sales $10,000,000-$50,000,000
# of Employees 153
Plant Area (Sq.Ft.) 116,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,367 3,686,401 kWh $0.03
Electricity Demand $103,837 12,279 kW-months/year $8.46
Natural Gas $48,047 7,981 MMBtu $6.02
TOTAL ENERGY COSTS $247,701
RECOMMENDED SAVINGS* $27,487 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,096
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,301
Cost:
$690
$654 19,343 $647 78 - - - - - - - - $654
19,343
kWh
$647
78
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,743
Cost:
$188
$1,784 60,668 $959 115 - - - - - - - - $1,784
60,668
kWh
$959
115
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$6,052
Cost:
$447
$2,296 77,960 $3,756 450 - - - - - - - - $2,296
77,960
kWh
$3,756
450
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,450
Cost:
$480
- - - - $450 30,000 - - $3,000 - - - -
-
kWh
-
-
kW-months/year
$450
30,000
lb
-
-
$
$3,000
-
$
-
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$13,840
Cost:
$1,350
- - - - - - - - - - $13,840 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$13,840
-
$
06: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$101
Cost:
$250
- - - - - - $101 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$101
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$27,487
Cost:
$3,405
$4,734 157,971 $5,362 643 $450 30,000 $101 - $3,000 - $13,840 - $4,734
157,971
kWh
$5,362
643
kW-months/year
$450
30,000
lb
$101
-
$
$3,000
-
$
$13,840
-
$
TOTAL IMPLEMENTED Savings:
$10,096
Cost:
$1,325
$4,734 157,971 $5,362 643 - - - - - - - - $4,734
157,971
kWh
$5,362
643
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material