IAC logo
IAC Assessment: NC0146
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0146
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product Residential oil fired heaters
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 52,000
Annual Production 15,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,034 511,430 kWh $0.05
Electricity Demand $8,481 1,977 kW-months/year $4.29
Electricity Fees $733 - $ -
LPG $11,088 1,246 MMBtu $8.90
Fuel Oil #2 $19,339 4,205 MMBtu $4.60
TOTAL ENERGY COSTS $63,675
RECOMMENDED SAVINGS* $18,316 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,316
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Other Liquid (non-haz) Other Liquid (haz) Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Other Liquid (non-haz) Other Liquid (haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ gal
01: 2.2514 COVER OPEN TANKS Savings:
$488
Cost:
$600
- - - - $488 106 - - - - - - -
-
kWh
-
-
kW-months/year
$488
106
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$920
Cost:
$800
- - - - $920 200 - - - - - - -
-
kWh
-
-
kW-months/year
$920
200
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$409
Cost:
$1,480
$(-122) (-2,638) $(-67) (-16) $598 130 - - - - - - $(-122)
(-2,638)
kWh
$(-67)
(-16)
kW-months/year
$598
130
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$178
Cost:
$200
- - - - $178 47 - - - - - - -
-
kWh
-
-
kW-months/year
$178
47
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$13,890
Cost:
$1,500
- - - - - - - - - - $13,890 1,086 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$13,890
1,086
gal
06: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS Savings:
$2,431
Cost:
-
- - - - - - $170 50,000 $2,261 380 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$170
50,000
Tgal
$2,261
380
gal
-
-
gal
TOTAL RECOMMENDED Savings:
$18,316
Cost:
$4,580
$(-122) (-2,638) $(-67) (-16) $2,184 483 $170 50,000 $2,261 380 $13,890 1,086 $(-122)
(-2,638)
kWh
$(-67)
(-16)
kW-months/year
$2,184
483
MMBtu
$170
50,000
Tgal
$2,261
380
gal
$13,890
1,086
gal
TOTAL IMPLEMENTED Savings:
$18,316
Cost:
$4,580
$(-122) (-2,638) $(-67) (-16) $2,184 483 $170 50,000 $2,261 380 $13,890 1,086 $(-122)
(-2,638)
kWh
$(-67)
(-16)
kW-months/year
$2,184
483
MMBtu
$170
50,000
Tgal
$2,261
380
gal
$13,890
1,086
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ gal
Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Other Liquid (non-haz) Other Liquid (haz) Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Other Liquid (non-haz) Other Liquid (haz)