IAC logo
IAC Assessment: NC0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product Prison clothing, mattresses, furniture
NAICS n/a
SIC 2329 - Men's and Boys' Clothing, Not Elsewhere Classified
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 225,000
Annual Production 30,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,575 2,241,208 kWh $0.05
Electricity Demand $40,103 8,201 kW-months/year $4.89
Electricity Fees $1,675 - $ -
Natural Gas $56,633 9,228 MMBtu $6.14
TOTAL ENERGY COSTS $204,361
RECOMMENDED SAVINGS* $125,155 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,432
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,282
Cost:
$200
$1,282 27,257 - - - - - - - - - - $1,282
27,257
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$610
Cost:
$500
- - - - $610 100 - - - - - - -
-
kWh
-
-
kW-months/year
$610
100
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$723
Cost:
$675
- - - - $723 118 - - - - - - -
-
kWh
-
-
kW-months/year
$723
118
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,356
Cost:
$4,000
- - - - $7,356 1,200 - - - - - - -
-
kWh
-
-
kW-months/year
$7,356
1,200
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$375
Cost:
$200
- - - - - - $375 25,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$375
25,000
lb
-
-
$
-
-
$
06: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$14,809
Cost:
-
$1,145 41,032 $683 82 $1,011 188 - - $11,970 - - - $1,145
41,032
kWh
$683
82
kW-months/year
$1,011
188
MMBtu
-
-
lb
$11,970
-
$
-
-
$
07: 4.451 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$100,000
Cost:
$1,000
- - - - - - - - - - $100,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$100,000
-
$
TOTAL RECOMMENDED Savings:
$125,155
Cost:
$6,575
$2,427 68,289 $683 82 $9,700 1,606 $375 25,000 $11,970 - $100,000 - $2,427
68,289
kWh
$683
82
kW-months/year
$9,700
1,606
MMBtu
$375
25,000
lb
$11,970
-
$
$100,000
-
$
TOTAL IMPLEMENTED Savings:
$24,432
Cost:
$4,900
$2,427 68,289 $683 82 $8,977 1,488 $375 25,000 $11,970 - - - $2,427
68,289
kWh
$683
82
kW-months/year
$8,977
1,488
MMBtu
$375
25,000
lb
$11,970
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes By-product Production