IAC Assessment: NC0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product Electrical connectors
NAICS n/a
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 187
Plant Area (Sq.Ft.) 132,600
Annual Production 7,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $240,402 7,374,267 kWh $0.03
Electricity Demand $178,718 15,886 kW-months/year $11.25
Electricity Fees $7,168 - $ -
TOTAL ENERGY COSTS $462,151
RECOMMENDED SAVINGS* $64,538 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,729
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $ $ %
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,388
Cost:
$1,000
$4,388 131,301 - - - - - - - - - - - - $4,388
131,301
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
%
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,988
Cost:
$13,000
$3,988 119,578 - - - - - - - - - - - - $3,988
119,578
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
%
03: 2.2514 COVER OPEN TANKS Savings:
$1,006
Cost:
$100
$601 17,878 $405 36 - - - - - - - - - - $601
17,878
kWh
$405
36
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
%
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$396
Cost:
$80
$234 7,034 $162 14 - - - - - - - - - - $234
7,034
kWh
$162
14
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
%
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,160
Cost:
-
$3,160 94,666 - - - - - - - - - - - - $3,160
94,666
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
%
06: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$3,010
Cost:
$5,000
- - - - - - $550 330 - - $2,460 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$550
330
gal
-
-
lb
$2,460
-
$
-
-
%
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$563
Cost:
$200
- - - - - - - - $563 37,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$563
37,500
lb
-
-
$
-
-
%
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$16,777
Cost:
$4,000
$(-107) (-3,224) $(-216) (-19) $17,100 5,000,000 - - - - - - - - $(-107)
(-3,224)
kWh
$(-216)
(-19)
kW-months/year
$17,100
5,000,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
%
09: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$31,250
Cost:
$12,850
- - - - - - - - - - - - $31,250 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$31,250
-
%
TOTAL RECOMMENDED Savings:
$64,538
Cost:
$36,230
$12,264 367,233 $351 31 $17,100 5,000,000 $550 330 $563 37,500 $2,460 - $31,250 - $12,264
367,233
kWh
$351
31
kW-months/year
$17,100
5,000,000
Tgal
$550
330
gal
$563
37,500
lb
$2,460
-
$
$31,250
-
%
TOTAL IMPLEMENTED Savings:
$4,729
Cost:
$300
$3,761 112,544 $405 36 - - - - $563 37,500 - - - - $3,761
112,544
kWh
$405
36
kW-months/year
-
-
Tgal
-
-
gal
$563
37,500
lb
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $ $ %
Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Increase in Production