IAC Assessment: NC0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product bath and kitchen faucets
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 280,000
Annual Production 11,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $986,707 30,266,706 kWh $0.03
Electricity Demand $611,763 54,379 kW-months/year $11.25
Electricity Fees $17,938 - $ -
Natural Gas $180,409 45,410 MMBtu $3.97
TOTAL ENERGY COSTS $1,796,817
RECOMMENDED SAVINGS* $564,527 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $526,046
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ %
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,453
Cost:
$15,000
$9,713 298,066 $4,590 408 $(-4,850) (-1,452) - - - - - - $9,713
298,066
kWh
$4,590
408
kW-months/year
$(-4,850)
(-1,452)
MMBtu
-
-
Tgal
-
-
$
-
-
%
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$27,013
Cost:
$1,295
$25,798 791,325 $1,215 108 - - - - - - - - $25,798
791,325
kWh
$1,215
108
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$461,046
Cost:
$1,000,000
$185,996 5,705,451 $161,257 14,334 $(-56,207) (-16,829) - - $170,000 - - - $185,996
5,705,451
kWh
$161,257
14,334
kW-months/year
$(-56,207)
(-16,829)
MMBtu
-
-
Tgal
$170,000
-
$
-
-
%
04: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$65,000
Cost:
$80,000
$32,625 1,000,879 $30,375 2,700 - - - - $(-4,000) - $6,000 - $32,625
1,000,879
kWh
$30,375
2,700
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-4,000)
-
$
$6,000
-
%
05: 3.1221 USE REACTIVE RINSING Savings:
$2,015
Cost:
$325
- - - - - - $2,015 360,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,015
360,000
Tgal
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$564,527
Cost:
$1,096,620
$254,132 7,795,721 $197,437 17,550 $(-61,057) (-18,281) $2,015 360,000 $166,000 - $6,000 - $254,132
7,795,721
kWh
$197,437
17,550
kW-months/year
$(-61,057)
(-18,281)
MMBtu
$2,015
360,000
Tgal
$166,000
-
$
$6,000
-
%
TOTAL IMPLEMENTED Savings:
$526,046
Cost:
$1,080,000
$218,621 6,706,330 $191,632 17,034 $(-56,207) (-16,829) - - $166,000 - $6,000 - $218,621
6,706,330
kWh
$191,632
17,034
kW-months/year
$(-56,207)
(-16,829)
MMBtu
-
-
Tgal
$166,000
-
$
$6,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ %
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Increase in Production