Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1999 |
Principal Product | Electrical switchgear |
NAICS | n/a |
SIC | 3613 - Switchgear And Switchboard Apparatus |
Sales | $50,000,000-$100,000,000 |
# of Employees | 270 |
Plant Area (Sq.Ft.) | 285,000 |
Annual Production | 11,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $379,787 | 8,062,427 | kWh | $0.05 |
Electricity Demand | $87,712 | 17,937 | kW-months/year | $4.89 |
Electricity Fees | $1,372 | - | $ | - |
LPG | $48,345 | 9,474 | MMBtu | $5.10 |
TOTAL ENERGY COSTS | $533,216 | |||
RECOMMENDED SAVINGS* | $240,674 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,208 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,968 Cost: $1,500 |
$1,968 | 41,911 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,968 41,911 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,307 Cost: $240 |
$1,131 | 24,033 | $176 | 36 | - | - | - | - | - | - | - | - | - | - |
$1,131 24,033 kWh |
$176 36 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $6,654 Cost: $2,000 |
$6,654 | 141,266 | - | - | - | - | - | - | - | - | - | - | - | - |
$6,654 141,266 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $98,761 Cost: $465,000 |
$37,021 | 838,804 | $18,240 | 3,731 | - | - | - | - | - | - | $43,500 | - | - | - |
$37,021 838,804 kWh |
$18,240 3,731 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$43,500 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $17,776 Cost: $20,000 |
$17,776 | 377,491 | - | - | - | - | - | - | - | - | - | - | - | - |
$17,776 377,491 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $3,015 Cost: $3,000 |
$2,515 | 53,341 | - | - | - | - | - | - | - | - | $500 | - | - | - |
$2,515 53,341 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$500 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $8,000 Cost: $200 |
- | - | - | - | - | - | $8,000 | 125,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,000 125,000 lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.451 ADD ADDITIONAL PRODUCTION SHIFT |
Savings: $100,000 Cost: $1,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $100,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $3,193 Cost: - |
$178 | 3,810 | - | - | $765 | 150 | - | - | $2,250 | - | - | - | - | - |
$178 3,810 kWh |
- - kW-months/year |
$765 150 MMBtu |
- - lb |
$2,250 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $240,674 Cost: $492,940 |
$67,243 | 1,480,656 | $18,416 | 3,767 | $765 | 150 | $8,000 | 125,000 | $2,250 | - | $44,000 | - | $100,000 | - | $67,243 1,480,656 kWh |
$18,416 3,767 kW-months/year |
$765 150 MMBtu |
$8,000 125,000 lb |
$2,250 - $ |
$44,000 - $ |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,208 Cost: $3,200 |
$2,693 | 57,151 | - | - | $765 | 150 | $8,000 | 125,000 | $2,250 | - | $500 | - | - | - | $2,693 57,151 kWh |
- - kW-months/year |
$765 150 MMBtu |
$8,000 125,000 lb |
$2,250 - $ |
$500 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production |