IAC logo
IAC Assessment: NC0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product Electrical switchgear
NAICS n/a
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $50,000,000-$100,000,000
# of Employees 270
Plant Area (Sq.Ft.) 285,000
Annual Production 11,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $379,787 8,062,427 kWh $0.05
Electricity Demand $87,712 17,937 kW-months/year $4.89
Electricity Fees $1,372 - $ -
LPG $48,345 9,474 MMBtu $5.10
TOTAL ENERGY COSTS $533,216
RECOMMENDED SAVINGS* $240,674 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,208
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,968
Cost:
$1,500
$1,968 41,911 - - - - - - - - - - - - $1,968
41,911
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,307
Cost:
$240
$1,131 24,033 $176 36 - - - - - - - - - - $1,131
24,033
kWh
$176
36
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$6,654
Cost:
$2,000
$6,654 141,266 - - - - - - - - - - - - $6,654
141,266
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$98,761
Cost:
$465,000
$37,021 838,804 $18,240 3,731 - - - - - - $43,500 - - - $37,021
838,804
kWh
$18,240
3,731
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$43,500
-
$
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$17,776
Cost:
$20,000
$17,776 377,491 - - - - - - - - - - - - $17,776
377,491
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,015
Cost:
$3,000
$2,515 53,341 - - - - - - - - $500 - - - $2,515
53,341
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$500
-
$
-
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$8,000
Cost:
$200
- - - - - - $8,000 125,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,000
125,000
lb
-
-
$
-
-
$
-
-
$
08: 4.451 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$100,000
Cost:
$1,000
- - - - - - - - - - - - $100,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$100,000
-
$
09: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$3,193
Cost:
-
$178 3,810 - - $765 150 - - $2,250 - - - - - $178
3,810
kWh
-
-
kW-months/year
$765
150
MMBtu
-
-
lb
$2,250
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$240,674
Cost:
$492,940
$67,243 1,480,656 $18,416 3,767 $765 150 $8,000 125,000 $2,250 - $44,000 - $100,000 - $67,243
1,480,656
kWh
$18,416
3,767
kW-months/year
$765
150
MMBtu
$8,000
125,000
lb
$2,250
-
$
$44,000
-
$
$100,000
-
$
TOTAL IMPLEMENTED Savings:
$14,208
Cost:
$3,200
$2,693 57,151 - - $765 150 $8,000 125,000 $2,250 - $500 - - - $2,693
57,151
kWh
-
-
kW-months/year
$765
150
MMBtu
$8,000
125,000
lb
$2,250
-
$
$500
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production