IAC logo
IAC Assessment: NC0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product Office partition paneling fabric
NAICS n/a
SIC 2399 - Fabricated Textile Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 98,000
Annual Production 1,500 Thousand Feet
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,814 5,368,699 kWh $0.03
Electricity Demand $90,904 10,790 kW-months/year $8.42
Electricity Fees $7,856 - $ -
Natural Gas $427,633 85,272 MMBtu $5.01
TOTAL ENERGY COSTS $688,420
RECOMMENDED SAVINGS* $276,922 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,536
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal $ $
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,107
Cost:
$800
- - - - $607 121 - - - - $500 - - - - - -
-
kWh
-
-
kW-months/year
$607
121
MMBtu
-
-
lb
-
-
$
$500
-
$
-
-
Tgal
-
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$35,782
Cost:
$800
- - - - $35,782 7,135 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$35,782
7,135
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,918
Cost:
$4,000
- - - - $4,918 982 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,918
982
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$877
Cost:
$300
- - - - $877 175 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$877
175
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$852
Cost:
$10
$548 18,171 $304 36 - - - - - - - - - - - - $548
18,171
kWh
$304
36
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$213
Cost:
$400
- - - - - - $213 7,500 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$213
7,500
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
07: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$90,000
Cost:
$7,500
- - - - - - - - - - - - - - $90,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
$90,000
-
$
08: 4.1250 Savings:
$143,173
Cost:
$137,600
- - - - $48,333 9,647 - - $57,240 - - - $37,600 - - - -
-
kWh
-
-
kW-months/year
$48,333
9,647
MMBtu
-
-
lb
$57,240
-
$
-
-
$
$37,600
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$276,922
Cost:
$151,410
$548 18,171 $304 36 $90,517 18,060 $213 7,500 $57,240 - $500 - $37,600 - $90,000 - $548
18,171
kWh
$304
36
kW-months/year
$90,517
18,060
MMBtu
$213
7,500
lb
$57,240
-
$
$500
-
$
$37,600
-
Tgal
$90,000
-
$
TOTAL IMPLEMENTED Savings:
$43,536
Cost:
$5,910
$548 18,171 $304 36 $42,184 8,413 - - - - $500 - - - - - $548
18,171
kWh
$304
36
kW-months/year
$42,184
8,413
MMBtu
-
-
lb
-
-
$
$500
-
$
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Primary Product