IAC logo
IAC Assessment: NC0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 150,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $515,222 21,930,833 kWh $0.02
Electricity Demand $484,144 43,035 kW-months/year $11.25
Electricity Fees $193,728 - $ -
Fuel Oil #6 $319,226 89,383 MMBtu $3.57
TOTAL ENERGY COSTS $1,512,508
RECOMMENDED SAVINGS* $226,924 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ %
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$125,000
Cost:
$52,000
- - - - - - - - - - $125,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$125,000
-
%
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$4,485
Cost:
-
- - - - $4,485 1,222 - - - - - - -
-
kWh
-
-
kW-months/year
$4,485
1,222
MMBtu
-
-
lb
-
-
$
-
-
%
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$636
Cost:
$476
- - - - $636 173 - - - - - - -
-
kWh
-
-
kW-months/year
$636
173
MMBtu
-
-
lb
-
-
$
-
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,986
Cost:
$40
$10,986 467,761 - - - - - - - - - - $10,986
467,761
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$71,741
Cost:
$40,000
- - - - $71,741 19,548 - - - - - - -
-
kWh
-
-
kW-months/year
$71,741
19,548
MMBtu
-
-
lb
-
-
$
-
-
%
06: 2.4154 AVOID REWINDING MOTORS MORE THAN TWICE Savings:
$10,026
Cost:
$25,900
$5,932 182,005 $4,094 365 - - - - - - - - $5,932
182,005
kWh
$4,094
365
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$188
Cost:
$300
- - - - - - $188 12,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$188
12,500
lb
-
-
$
-
-
%
08: 3.4151 MINIMIZE WATER USAGE Savings:
$2,627
Cost:
$2,500
- - - - $2,627 751 - - - - - - -
-
kWh
-
-
kW-months/year
$2,627
751
MMBtu
-
-
lb
-
-
$
-
-
%
09: 3.4151 MINIMIZE WATER USAGE Savings:
$1,235
Cost:
$1,200
- - - - - - - - $1,235 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,235
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$226,924
Cost:
$122,416
$16,918 649,766 $4,094 365 $79,489 21,694 $188 12,500 $1,235 - $125,000 - $16,918
649,766
kWh
$4,094
365
kW-months/year
$79,489
21,694
MMBtu
$188
12,500
lb
$1,235
-
$
$125,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ %
Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Ancillary Material Cost Increase in Production