IAC logo
IAC Assessment: NC0175
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0175
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product Packaged medical supplies
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 100,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,347 4,802,755 kWh $0.03
Electricity Demand $85,768 8,970 kW-months/year $9.56
Electricity Fees $597 - $ -
Natural Gas $19,966 3,451 MMBtu $5.79
TOTAL ENERGY COSTS $233,598
RECOMMENDED SAVINGS* $94,161 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ Tgal
01: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$2,400
Cost:
$1,000
- - - - - - - - $2,400 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,400
-
$
-
-
$
-
-
$
-
-
Tgal
02: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$52,800
Cost:
$1,000
- - - - - - - - - - $52,800 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$52,800
-
$
-
-
$
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,698
Cost:
$3,000
$3,698 142,145 - - - - - - - - - - - - - - $3,698
142,145
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,887
Cost:
$8,000
$4,774 183,763 $8,647 918 $(-4,534) (-783) - - - - - - - - - - $4,774
183,763
kWh
$8,647
918
kW-months/year
$(-4,534)
(-783)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,727
Cost:
$5,500
$4,160 160,023 $4,522 480 $(-3,955) (-683) - - - - - - - - - - $4,160
160,023
kWh
$4,522
480
kW-months/year
$(-3,955)
(-683)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,424
Cost:
$500
$725 27,843 $1,311 139 - - - - - - - - $100 - $288 - $725
27,843
kWh
$1,311
139
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$100
-
$
$288
-
Tgal
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,920
Cost:
$500
- - - - - - $1,920 72,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,920
72,000
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,172
Cost:
$200
$826 41,911 - - - - - - - - - - - - $346 - $826
41,911
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$346
-
Tgal
09: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$16,133
Cost:
$1,000
- - - - - - - - - - - - - - $16,133 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$16,133
-
Tgal
TOTAL RECOMMENDED Savings:
$94,161
Cost:
$20,700
$14,183 555,685 $14,480 1,537 $(-8,489) (-1,466) $1,920 72,000 $2,400 - $52,800 - $100 - $16,767 - $14,183
555,685
kWh
$14,480
1,537
kW-months/year
$(-8,489)
(-1,466)
MMBtu
$1,920
72,000
lb
$2,400
-
$
$52,800
-
$
$100
-
$
$16,767
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Water Consumption