Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1999 |
Principal Product | Finishing services |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 263,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $28,067 | 595,838 | kWh | $0.05 |
Electricity Demand | $23,291 | 4,763 | kW-months/year | $4.89 |
Electricity Fees | $4,881 | - | $ | - |
Natural Gas | $23,266 | 3,894 | MMBtu | $5.97 |
TOTAL ENERGY COSTS | $79,505 | |||
RECOMMENDED SAVINGS* | $116,977 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,936 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | Primary Product | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | Primary Product | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $71 Cost: $150 |
$48 | 879 | $23 | 5 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$48 879 kWh |
$23 5 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $180 Cost: $640 |
$101 | 2,052 | $79 | 16 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$101 2,052 kWh |
$79 16 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $639 Cost: $1,000 |
- | - | - | - | $639 | 107 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$639 107 MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,080 Cost: $5,000 |
$2,036 | 43,083 | $704 | 144 | $(-1,260) | (-211) | - | - | $1,600 | - | - | - | - | - | - | - | - | - |
$2,036 43,083 kWh |
$704 144 kW-months/year |
$(-1,260) (-211) MMBtu |
- - lb |
$1,600 - $ |
- - $ |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $242 Cost: $300 |
$125 | 2,638 | $117 | 24 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$125 2,638 kWh |
$117 24 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $639 Cost: $768 |
- | - | - | - | $639 | 107 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$639 107 MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $450 Cost: $300 |
- | - | - | - | - | - | $450 | 30,000 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$450 30,000 lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER |
Savings: $373 Cost: $420 |
- | - | - | - | - | - | - | - | - | - | - | - | $373 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$373 - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $89,503 Cost: $60,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $(-497) | - | - | - | $90,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$(-497) - Tgal |
- - $ |
$90,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.731 ADVERTISE PRODUCT OR SERVICE |
Savings: $21,800 Cost: $200 |
- | - | - | - | - | - | - | - | - | - | $(-11,500) | - | - | - | $33,300 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$(-11,500) - $ |
- - Tgal |
$33,300 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $116,977 Cost: $68,778 |
$2,310 | 48,652 | $923 | 189 | $18 | 3 | $450 | 30,000 | $1,600 | - | $(-11,500) | - | $(-124) | - | $33,300 | - | $90,000 | - | $2,310 48,652 kWh |
$923 189 kW-months/year |
$18 3 MMBtu |
$450 30,000 lb |
$1,600 - $ |
$(-11,500) - $ |
$(-124) - Tgal |
$33,300 - $ |
$90,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,936 Cost: $1,370 |
$173 | 3,517 | $140 | 29 | - | - | $450 | 30,000 | - | - | $(-11,500) | - | $373 | - | $33,300 | - | - | - | $173 3,517 kWh |
$140 29 kW-months/year |
- - MMBtu |
$450 30,000 lb |
- - $ |
$(-11,500) - $ |
$373 - Tgal |
$33,300 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | Primary Product | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | Primary Product | Increase in Production |