IAC logo
IAC Assessment: NC0179
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0179
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1999
Principal Product Painted parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 11
Plant Area (Sq.Ft.) 48,000
Annual Production 50,000 Pieces
Production Hrs. Annual 2,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,245 443,728 kWh $0.05
Electricity Demand $8,565 2,202 kW-months/year $3.89
Electricity Fees $29 - $ -
Natural Gas $22,821 4,207 MMBtu $5.42
TOTAL ENERGY COSTS $62,513
RECOMMENDED SAVINGS* $9,681 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,268
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$453
Cost:
$340
$304 6,448 $149 38 - - - - - - - - $304
6,448
kWh
$149
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$128
Cost:
$120
$105 2,052 $23 6 - - - - - - - - $105
2,052
kWh
$23
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
03: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$121
Cost:
$640
$82 1,758 $39 10 - - - - - - - - $82
1,758
kWh
$39
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$164
Cost:
$800
- - - - $164 30 - - - - - - -
-
kWh
-
-
kW-months/year
$164
30
MMBtu
-
-
$
-
-
Tgal
-
-
$
05: 3.4153 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER Savings:
$4,315
Cost:
$1,425
$(-36) (-879) $(-17) (-4) - - - - $4,368 - - - $(-36)
(-879)
kWh
$(-17)
(-4)
kW-months/year
-
-
MMBtu
-
-
$
$4,368
-
Tgal
-
-
$
06: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$4,000
Cost:
$2,500
- - - - - - $4,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,000
-
$
-
-
Tgal
-
-
$
07: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$500
Cost:
-
- - - - - - - - - - $500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
$500
-
$
TOTAL RECOMMENDED Savings:
$9,681
Cost:
$5,825
$455 9,379 $194 50 $164 30 $4,000 - $4,368 - $500 - $455
9,379
kWh
$194
50
kW-months/year
$164
30
MMBtu
$4,000
-
$
$4,368
-
Tgal
$500
-
$
TOTAL IMPLEMENTED Savings:
$5,268
Cost:
$1,765
$268 5,569 $132 34 - - - - $4,368 - $500 - $268
5,569
kWh
$132
34
kW-months/year
-
-
MMBtu
-
-
$
$4,368
-
Tgal
$500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Primary Product