Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2000 |
Principal Product | Gasoline pumps |
NAICS | n/a |
SIC | 3586 - Measuring And Dispensing Pumps |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 165,000 |
Annual Production | 16,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $66,623 | 1,213,072 | kWh | $0.05 |
Electricity Demand | $31,991 | 3,906 | kW-months/year | $8.19 |
Natural Gas | $12,586 | 2,206 | MMBtu | $5.71 |
TOTAL ENERGY COSTS | $128,480 | |||
RECOMMENDED SAVINGS* | $70,013 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,301 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $7,429 Cost: $2,731 |
$3,069 | 56,272 | $2,760 | 337 | - | - | - | - | - | - | - | - | - | - | $1,600 | - |
$3,069 56,272 kWh |
$2,760 337 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
$1,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $6,611 Cost: $11,000 |
$6,611 | 121,043 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$6,611 121,043 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS |
Savings: $3,631 Cost: $7,500 |
$1,342 | 24,619 | $2,289 | 279 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,342 24,619 kWh |
$2,289 279 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $5,091 Cost: $3,300 |
$2,170 | 39,859 | - | - | $2,921 | 549 | - | - | - | - | - | - | - | - | - | - |
$2,170 39,859 kWh |
- - kW-months/year |
$2,921 549 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $884 Cost: $600 |
$465 | 8,499 | $419 | 51 | - | - | - | - | - | - | - | - | - | - | - | - |
$465 8,499 kWh |
$419 51 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $4,983 Cost: $10,750 |
$2,565 | 46,893 | $2,418 | 295 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,565 46,893 kWh |
$2,418 295 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS |
Savings: $13,598 Cost: $12,000 |
$(-524) | (-9,672) | - | - | - | - | $(-878) | (-240,000) | $6,240 | 3,200 | - | - | $8,760 | - | - | - |
$(-524) (-9,672) kWh |
- - kW-months/year |
- - MMBtu |
$(-878) (-240,000) Tgal |
$6,240 3,200 gal |
- - lb |
$8,760 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $6,838 Cost: $3,700 |
$(-63) | (-1,172) | $(-102) | (-12) | - | - | $7,003 | 1,989,600 | - | - | - | - | - | - | - | - |
$(-63) (-1,172) kWh |
$(-102) (-12) kW-months/year |
- - MMBtu |
$7,003 1,989,600 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $500 Cost: $500 |
- | - | - | - | - | - | - | - | - | - | $500 | 8,250 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$500 8,250 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND |
Savings: $20,448 Cost: $5,000 |
$1,698 | 31,067 | - | - | - | - | - | - | - | - | - | - | $18,750 | - | - | - |
$1,698 31,067 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$18,750 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,013 Cost: $57,081 |
$17,333 | 317,408 | $7,784 | 950 | $2,921 | 549 | $6,125 | 1,749,600 | $6,240 | 3,200 | $500 | 8,250 | $27,510 | - | $1,600 | - | $17,333 317,408 kWh |
$7,784 950 kW-months/year |
$2,921 549 MMBtu |
$6,125 1,749,600 Tgal |
$6,240 3,200 gal |
$500 8,250 lb |
$27,510 - $ |
$1,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,301 Cost: $26,331 |
$13,950 | 255,568 | $3,077 | 376 | $2,921 | 549 | $7,003 | 1,989,600 | - | - | - | - | $18,750 | - | $1,600 | - | $13,950 255,568 kWh |
$3,077 376 kW-months/year |
$2,921 549 MMBtu |
$7,003 1,989,600 Tgal |
- - gal |
- - lb |
$18,750 - $ |
$1,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |