Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2001 |
Principal Product | Surgical skin adhesives |
NAICS | n/a |
SIC | 2891 - Adhesives And Sealants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 50,000 Pounds |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $65,038 | 2,118,500 | kWh | $0.03 |
Electricity Demand | $42,449 | 4,950 | kW-months/year | $8.58 |
Electricity Fees | $523 | - | $ | - |
Natural Gas | $35,522 | 4,643 | MMBtu | $7.65 |
TOTAL ENERGY COSTS | $169,932 | |||
RECOMMENDED SAVINGS* | $265,306 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $93 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $4,150 Cost: $1,000 |
$2,286 | 74,471 | $1,864 | 223 | - | - | - | - | - | - |
$2,286 74,471 kWh |
$1,864 223 kW-months/year |
- - gal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $1,330 Cost: $4,000 |
$845 | 27,529 | $485 | 55 | - | - | - | - | - | - |
$845 27,529 kWh |
$485 55 kW-months/year |
- - gal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $91 Cost: $65 |
$47 | 1,542 | $44 | 5 | - | - | - | - | - | - |
$47 1,542 kWh |
$44 5 kW-months/year |
- - gal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $93 Cost: $100 |
$53 | 1,730 | $40 | 5 | - | - | - | - | - | - |
$53 1,730 kWh |
$40 5 kW-months/year |
- - gal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7197 USE ULTRASONIC CLEANING |
Savings: $19,642 Cost: $5,000 |
$(-207) | (-6,750) | $(-301) | (-36) | $2,400 | 660 | $17,750 | - | - | - |
$(-207) (-6,750) kWh |
$(-301) (-36) kW-months/year |
$2,400 660 gal |
$17,750 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.125 |
Savings: $240,000 Cost: $270,000 |
- | - | - | - | - | - | - | - | $240,000 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - $ |
$240,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $265,306 Cost: $280,165 |
$3,024 | 98,522 | $2,132 | 252 | $2,400 | 660 | $17,750 | - | $240,000 | - | $3,024 98,522 kWh |
$2,132 252 kW-months/year |
$2,400 660 gal |
$17,750 - $ |
$240,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $93 Cost: $100 |
$53 | 1,730 | $40 | 5 | - | - | - | - | - | - | $53 1,730 kWh |
$40 5 kW-months/year |
- - gal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Increase in Production |