IAC logo
IAC Assessment: NC0226
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0226
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2001
Principal Product Phone cable
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 475
Plant Area (Sq.Ft.) 500,000
Annual Production 35,900,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $868,921 36,138,000 kWh $0.02
Electricity Demand $851,872 59,726 kW-months/year $14.26
Electricity Fees $77,282 - $ -
Natural Gas $86,642 9,294 MMBtu $9.32
TOTAL ENERGY COSTS $1,884,717
RECOMMENDED SAVINGS* $136,519 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$10,828
Cost:
$12,834
$5,866 244,432 $4,962 348 - - - - - - $5,866
244,432
kWh
$4,962
348
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,348
Cost:
$500
$17,440 726,600 $14,800 1,038 $(-28,892) (-3,100) - - - - $17,440
726,600
kWh
$14,800
1,038
kW-months/year
$(-28,892)
(-3,100)
MMBtu
-
-
Tgal
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,071
Cost:
$407
$1,142 47,583 $929 65 - - - - - - $1,142
47,583
kWh
$929
65
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,800
Cost:
$400
$993 41,371 $807 57 - - - - - - $993
41,371
kWh
$807
57
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,122
Cost:
$2,225
$607 25,310 $515 36 - - - - - - $607
25,310
kWh
$515
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$279
Cost:
$150
$154 6,423 $125 9 - - - - - - $154
6,423
kWh
$125
9
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$23,668
Cost:
$26,000
$12,802 533,400 $10,866 762 - - - - - - $12,802
533,400
kWh
$10,866
762
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$93,403
Cost:
$(-312,000)
$21,072 877,998 $52,986 3,717 - - $(-6,655) (-5,800,000) $26,000 - $21,072
877,998
kWh
$52,986
3,717
kW-months/year
-
-
MMBtu
$(-6,655)
(-5,800,000)
Tgal
$26,000
-
$
TOTAL RECOMMENDED Savings:
$136,519
Cost:
$(-269,484)
$60,076 2,503,117 $85,990 6,032 $(-28,892) (-3,100) $(-6,655) (-5,800,000) $26,000 - $60,076
2,503,117
kWh
$85,990
6,032
kW-months/year
$(-28,892)
(-3,100)
MMBtu
$(-6,655)
(-5,800,000)
Tgal
$26,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes