Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2002
Principal Product Tissue boxes
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 108,000
Annual Production 300,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,668 5,933,040 kWh $0.03
Electricity Demand $106,903 11,226 kW-months/year $9.52
Electricity Fees $8,624 - $ -
Natural Gas $41,142 4,303 MMBtu $9.56
TOTAL ENERGY COSTS $316,337
RECOMMENDED SAVINGS* $33,365 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,434
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$13,002
Cost:
$800
$(-119) (-4,416) $(-83) (-9) - - $13,204 3,292,790 $(-119)
(-4,416)
kWh
$(-83)
(-9)
kW-months/year
-
-
MMBtu
$13,204
3,292,790
Tgal
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$12,335
Cost:
$15,000
$794 29,405 $11,541 1,225 - - - - $794
29,405
kWh
$11,541
1,225
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,645
Cost:
$1,818
$1,098 40,653 $547 58 - - - - $1,098
40,653
kWh
$547
58
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$561
Cost:
$248
$374 13,860 $187 20 - - - - $374
13,860
kWh
$187
20
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$740
Cost:
$150
$494 18,294 $246 26 - - - - $494
18,294
kWh
$246
26
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$596
Cost:
$1,100
- - - - $596 59 - - -
-
kWh
-
-
kW-months/year
$596
59
MMBtu
-
-
Tgal
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,486
Cost:
$850
$2,994 110,880 $1,492 158 - - - - $2,994
110,880
kWh
$1,492
158
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$33,365
Cost:
$19,966
$5,635 208,676 $13,930 1,478 $596 59 $13,204 3,292,790 $5,635
208,676
kWh
$13,930
1,478
kW-months/year
$596
59
MMBtu
$13,204
3,292,790
Tgal
TOTAL IMPLEMENTED Savings:
$20,434
Cost:
$3,866
$4,841 179,271 $2,389 253 - - $13,204 3,292,790 $4,841
179,271
kWh
$2,389
253
kW-months/year
-
-
MMBtu
$13,204
3,292,790
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal