Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2002 |
Principal Product | Sockets for tool kits |
NAICS | n/a |
SIC | 3423 - Hand And Edge Tools, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 475 |
Plant Area (Sq.Ft.) | 175,000 |
Annual Production | 18,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
TOTAL ENERGY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,703 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,870 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $47,833 Cost: $90,000 |
$(-2,789) | (-99,600) | $(-1,876) | (-199) | - | - | $58,248 | 323,600 | $(-5,750) | - |
$(-2,789) (-99,600) kWh |
$(-1,876) (-199) kW-months/year |
- - MMBtu |
$58,248 323,600 lb |
$(-5,750) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $744 Cost: $800 |
- | - | - | - | $744 | 124 | - | - | - | - |
- - kWh |
- - kW-months/year |
$744 124 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,927 Cost: $500 |
$1,317 | 47,035 | $610 | 65 | - | - | - | - | - | - |
$1,317 47,035 kWh |
$610 65 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $199 Cost: $289 |
$119 | 4,233 | $80 | 9 | - | - | - | - | - | - |
$119 4,233 kWh |
$80 9 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $50,703 Cost: $91,589 |
$(-1,353) | (-48,332) | $(-1,186) | (-125) | $744 | 124 | $58,248 | 323,600 | $(-5,750) | - | $(-1,353) (-48,332) kWh |
$(-1,186) (-125) kW-months/year |
$744 124 MMBtu |
$58,248 323,600 lb |
$(-5,750) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,870 Cost: $1,589 |
$1,436 | 51,268 | $690 | 74 | $744 | 124 | - | - | - | - | $1,436 51,268 kWh |
$690 74 kW-months/year |
$744 124 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes |