IAC Assessment: NC0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2002
Principal Product Forged and cast metal parts
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 280,000
Annual Production 17,662,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $884,264 26,894,911 kWh $0.03
Electricity Demand $309,804 14,865 kW-months/year $20.84
Electricity Fees $49,740 - $ -
Natural Gas $745,180 92,623 MMBtu $8.05
TOTAL ENERGY COSTS $1,988,988
RECOMMENDED SAVINGS* $13,715 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,706
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$6,456
Cost:
$8,000
- - - - $6,456 797 -
-
kWh
-
-
kW-months/year
$6,456
797
MMBtu
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,506
Cost:
$6,000
$1,506 45,770 - - - - $1,506
45,770
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,751
Cost:
$6,493
$2,354 71,541 $2,397 143 - - $2,354
71,541
kWh
$2,397
143
kW-months/year
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$503
Cost:
$576
$249 7,569 $254 15 - - $249
7,569
kWh
$254
15
kW-months/year
-
-
MMBtu
05: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$499
Cost:
$1,600
$499 62 - - - - $499
62
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,715
Cost:
$22,669
$4,608 124,942 $2,651 158 $6,456 797 $4,608
124,942
kWh
$2,651
158
kW-months/year
$6,456
797
MMBtu
TOTAL IMPLEMENTED Savings:
$11,706
Cost:
$16,093
$2,853 71,603 $2,397 143 $6,456 797 $2,853
71,603
kWh
$2,397
143
kW-months/year
$6,456
797
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas