IAC Assessment: NC0251
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0251
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2002
Principal Product Aluminum extrusions
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 130,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $401,600 8,172,000 kWh $0.05
Electricity Demand $101,502 20,757 kW-months/year $4.89
Electricity Fees $2,215 - $ -
Natural Gas $325,509 53,072 MMBtu $6.13
TOTAL ENERGY COSTS $830,826
RECOMMENDED SAVINGS* $95,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,272
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3522 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES Savings:
$29,079
Cost:
$130,000
$25,488 514,080 $3,591 734 - - $25,488
514,080
kWh
$3,591
734
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$50,797
Cost:
$100,000
- - - - $50,797 8,424 -
-
kWh
-
-
kW-months/year
$50,797
8,424
MMBtu
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$4,593
Cost:
$7,000
- - - - $4,593 762 -
-
kWh
-
-
kW-months/year
$4,593
762
MMBtu
04: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$6,367
Cost:
$10,000
$5,581 112,560 $786 161 - - $5,581
112,560
kWh
$786
161
kW-months/year
-
-
MMBtu
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$4,768
Cost:
$10,000
- - - - $4,768 791 -
-
kWh
-
-
kW-months/year
$4,768
791
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$137
Cost:
$574
$113 2,262 $24 6 - - $113
2,262
kWh
$24
6
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$95,741
Cost:
$257,574
$31,182 628,902 $4,401 901 $60,158 9,977 $31,182
628,902
kWh
$4,401
901
kW-months/year
$60,158
9,977
MMBtu
TOTAL IMPLEMENTED Savings:
$11,272
Cost:
$20,574
$5,694 114,822 $810 167 $4,768 791 $5,694
114,822
kWh
$810
167
kW-months/year
$4,768
791
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas