IAC logo
IAC Assessment: NC0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2003
Principal Product Roasted In-shell Peanuts
NAICS 326111 - Plastics Bag and Pouch Manufacturing
SIC 2068 - Salted And Roasted Nuts And Seeds
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 42,500
Annual Production 35,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,046 1,309,170 kWh $0.04
Electricity Demand $32,116 2,986 kW-months/year $10.76
Electricity Fees $3,229 - $ -
LPG $249,945 40,134 MMBtu $6.23
TOTAL ENERGY COSTS $331,336
RECOMMENDED SAVINGS* $49,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$396
Cost:
$208
$218 6,192 $178 17 - - $218
6,192
kWh
$178
17
kW-months/year
-
-
MMBtu
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$19,437
Cost:
$8,000
- - - - $19,437 3,119 -
-
kWh
-
-
kW-months/year
$19,437
3,119
MMBtu
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$16,074
Cost:
$9,000
- - - - $16,074 2,600 -
-
kWh
-
-
kW-months/year
$16,074
2,600
MMBtu
04: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$606
Cost:
$176
- - - - $606 97 -
-
kWh
-
-
kW-months/year
$606
97
MMBtu
05: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$11,263
Cost:
$16,548
- - - - $11,263 1,808 -
-
kWh
-
-
kW-months/year
$11,263
1,808
MMBtu
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$234
Cost:
-
$234 6,645 - - - - $234
6,645
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$347
Cost:
$260
$215 6,125 $132 12 - - $215
6,125
kWh
$132
12
kW-months/year
-
-
MMBtu
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$264
Cost:
$252
$164 4,652 $100 9 - - $164
4,652
kWh
$100
9
kW-months/year
-
-
MMBtu
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$806
Cost:
$550
$328 9,330 $478 44 - - $328
9,330
kWh
$478
44
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$49,427
Cost:
$34,994
$1,159 32,944 $888 82 $47,380 7,624 $1,159
32,944
kWh
$888
82
kW-months/year
$47,380
7,624
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG