IAC Assessment: NC0271
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2003
Principal Product Power Transmission Components
NAICS 333612 - Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566 - Speed Changers, Drives, And Gears
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 140,000
Annual Production 1,450,000 Pieces
Production Hrs. Annual 5,800
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $351,701 6,923,250 kWh $0.05
Electricity Demand $98,429 20,129 kW-months/year $4.89
Electricity Fees $13,122 - $ -
Natural Gas $6,858 758 MMBtu $9.05
TOTAL ENERGY COSTS $470,110
RECOMMENDED SAVINGS* $91,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,523
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,523
Cost:
$50
$5,080 100,000 $443 91 - - - - - - $5,080
100,000
kWh
$443
91
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,935
Cost:
$4,065
$9,935 195,566 - - - - - - - - $9,935
195,566
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$18,792
Cost:
$27,000
$16,624 327,244 $2,168 444 - - - - - - $16,624
327,244
kWh
$2,168
444
kW-months/year
-
-
$
-
-
$
-
-
$
04: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$56,248
Cost:
$120,000
$(-6,560) (-129,120) $(-1,056) (-216) - - $(-5,000) - $68,864 - $(-6,560)
(-129,120)
kWh
$(-1,056)
(-216)
kW-months/year
-
-
$
$(-5,000)
-
$
$68,864
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$204
Cost:
$150
$158 3,120 $46 9 - - - - - - $158
3,120
kWh
$46
9
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$796
Cost:
$100
$1,498 29,496 $198 40 $(-600) - $(-300) - - - $1,498
29,496
kWh
$198
40
kW-months/year
$(-600)
-
$
$(-300)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,498
Cost:
$151,365
$26,735 526,306 $1,799 368 $(-600) - $(-5,300) - $68,864 - $26,735
526,306
kWh
$1,799
368
kW-months/year
$(-600)
-
$
$(-5,300)
-
$
$68,864
-
$
TOTAL IMPLEMENTED Savings:
$6,523
Cost:
$300
$6,736 132,616 $687 140 $(-600) - $(-300) - - - $6,736
132,616
kWh
$687
140
kW-months/year
$(-600)
-
$
$(-300)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost