Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2004 |
Principal Product | Blow molded plastic products |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3080 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 216,000 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $477,382 | 13,183,700 | kWh | $0.04 |
Electricity Demand | $276,929 | 24,607 | kW-months/year | $11.25 |
Electricity Fees | $9,657 | - | $ | - |
Natural Gas | $25,666 | 2,884 | MMBtu | $8.90 |
TOTAL ENERGY COSTS | $789,634 | |||
RECOMMENDED SAVINGS* | $69,578 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,455 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $13,019 Cost: $18,000 |
$(-1,250) | (-33,923) | $(-1,244) | (-111) | $15,513 | 1,743 | - | - |
$(-1,250) (-33,923) kWh |
$(-1,244) (-111) kW-months/year |
$15,513 1,743 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $14,986 Cost: $16,406 |
$(-565) | (-15,320) | $(-344) | (-31) | $15,895 | 1,786 | - | - |
$(-565) (-15,320) kWh |
$(-344) (-31) kW-months/year |
$15,895 1,786 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES |
Savings: $18,000 Cost: $8,050 |
- | - | - | - | - | - | $18,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$18,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $14,713 Cost: $3,487 |
$9,138 | 247,987 | $5,575 | 496 | - | - | - | - |
$9,138 247,987 kWh |
$5,575 496 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,432 Cost: $1,085 |
$890 | 24,149 | $542 | 48 | - | - | - | - |
$890 24,149 kWh |
$542 48 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $4,405 Cost: $5,000 |
$4,405 | 119,550 | - | - | - | - | - | - |
$4,405 119,550 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,023 Cost: $1,170 |
$1,877 | 50,940 | $1,146 | 102 | - | - | - | - |
$1,877 50,940 kWh |
$1,146 102 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $69,578 Cost: $53,198 |
$14,495 | 393,383 | $5,675 | 504 | $31,408 | 3,529 | $18,000 | - | $14,495 393,383 kWh |
$5,675 504 kW-months/year |
$31,408 3,529 MMBtu |
$18,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,455 Cost: $10,305 |
$2,767 | 75,089 | $1,688 | 150 | - | - | $18,000 | - | $2,767 75,089 kWh |
$1,688 150 kW-months/year |
- - MMBtu |
$18,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |