IAC Assessment: NC0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Polypropylene yarn
NAICS 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824 - Organic Fibers, Noncellulosic
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 250,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $984,634 24,097,737 kWh $0.04
Electricity Demand $401,760 72,000 kW-months/year $5.58
Electricity Fees $38,373 - $ -
TOTAL ENERGY COSTS $1,424,767
RECOMMENDED SAVINGS* $291,725 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes
$ kWh $ $ $ $
01: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$193,423
Cost:
$70,000
$(-3,577) (-87,548) - - $197,000 - $(-3,577)
(-87,548)
kWh
-
-
$
$197,000
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$73,723
Cost:
$50
$73,723 1,804,280 - - - - $73,723
1,804,280
kWh
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,625
Cost:
$35,000
$7,625 186,620 - - - - $7,625
186,620
kWh
-
-
$
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$10,838
Cost:
$6,000
$10,838 265,250 - - - - $10,838
265,250
kWh
-
-
$
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$3,258
Cost:
$4,000
$3,258 79,764 - - - - $3,258
79,764
kWh
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,158
Cost:
$1,060
$2,798 68,456 $(-640) - - - $2,798
68,456
kWh
$(-640)
-
$
-
-
$
07: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$700
Cost:
$400
$700 17,132 - - - - $700
17,132
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$291,725
Cost:
$116,510
$95,365 2,333,954 $(-640) - $197,000 - $95,365
2,333,954
kWh
$(-640)
-
$
$197,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes