IAC logo
IAC Assessment: NC0302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Cases of bacon, hams, sausage
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 295,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 2,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $781,632 21,506,885 kWh $0.04
Electricity Demand $497,821 42,545 kW-months/year $11.70
Electricity Fees $6,000 - $ -
Natural Gas $261,739 54,942 MMBtu $4.76
TOTAL ENERGY COSTS $1,547,192
RECOMMENDED SAVINGS* $72,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $66,940
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$59,627
Cost:
$136,000
$(-3,972) (-107,800) $(-1,243) (-134) $(-10,158) (-2,134) $75,000 - - - $(-3,972)
(-107,800)
kWh
$(-1,243)
(-134)
kW-months/year
$(-10,158)
(-2,134)
MMBtu
$75,000
-
$
-
-
$
02: 2.2626 AVOID FROST FORMATION ON EVAPORATORS Savings:
$5,926
Cost:
$19,000
$4,438 120,446 $1,488 161 - - - - - - $4,438
120,446
kWh
$1,488
161
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$953
Cost:
$100
$1,364 37,026 $489 53 - - $(-600) - $(-300) - $1,364
37,026
kWh
$489
53
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-300)
-
$
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$372
Cost:
-
- - - - $372 62 - - - - -
-
kWh
-
-
kW-months/year
$372
62
MMBtu
-
-
$
-
-
$
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$5,988
Cost:
-
- - - - $5,988 998 - - - - -
-
kWh
-
-
kW-months/year
$5,988
998
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$72,866
Cost:
$155,100
$1,830 49,672 $734 80 $(-3,798) (-1,074) $74,400 - $(-300) - $1,830
49,672
kWh
$734
80
kW-months/year
$(-3,798)
(-1,074)
MMBtu
$74,400
-
$
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$66,940
Cost:
$136,100
$(-2,608) (-70,774) $(-754) (-81) $(-3,798) (-1,074) $74,400 - $(-300) - $(-2,608)
(-70,774)
kWh
$(-754)
(-81)
kW-months/year
$(-3,798)
(-1,074)
MMBtu
$74,400
-
$
$(-300)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost