Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2004 |
Principal Product | Cases of bacon, hams, sausage |
NAICS | 311611 - Animal (except Poultry) Slaughtering |
SIC | 2011 - Meat Packing Plants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 295,000 |
Annual Production | 3,000,000 Pieces |
Production Hrs. Annual | 2,500 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $781,632 | 21,506,885 | kWh | $0.04 |
Electricity Demand | $497,821 | 42,545 | kW-months/year | $11.70 |
Electricity Fees | $6,000 | - | $ | - |
Natural Gas | $261,739 | 54,942 | MMBtu | $4.76 |
TOTAL ENERGY COSTS | $1,547,192 | |||
RECOMMENDED SAVINGS* | $72,866 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $66,940 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM |
Savings: $59,627 Cost: $136,000 |
$(-3,972) | (-107,800) | $(-1,243) | (-134) | $(-10,158) | (-2,134) | $75,000 | - | - | - |
$(-3,972) (-107,800) kWh |
$(-1,243) (-134) kW-months/year |
$(-10,158) (-2,134) MMBtu |
$75,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2626 AVOID FROST FORMATION ON EVAPORATORS |
Savings: $5,926 Cost: $19,000 |
$4,438 | 120,446 | $1,488 | 161 | - | - | - | - | - | - |
$4,438 120,446 kWh |
$1,488 161 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $953 Cost: $100 |
$1,364 | 37,026 | $489 | 53 | - | - | $(-600) | - | $(-300) | - |
$1,364 37,026 kWh |
$489 53 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $372 Cost: - |
- | - | - | - | $372 | 62 | - | - | - | - |
- - kWh |
- - kW-months/year |
$372 62 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $5,988 Cost: - |
- | - | - | - | $5,988 | 998 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,988 998 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,866 Cost: $155,100 |
$1,830 | 49,672 | $734 | 80 | $(-3,798) | (-1,074) | $74,400 | - | $(-300) | - | $1,830 49,672 kWh |
$734 80 kW-months/year |
$(-3,798) (-1,074) MMBtu |
$74,400 - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $66,940 Cost: $136,100 |
$(-2,608) | (-70,774) | $(-754) | (-81) | $(-3,798) | (-1,074) | $74,400 | - | $(-300) | - | $(-2,608) (-70,774) kWh |
$(-754) (-81) kW-months/year |
$(-3,798) (-1,074) MMBtu |
$74,400 - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |