IAC logo
IAC Assessment: NC0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2005
Principal Product Fiber optic cable
NAICS 335921 - Fiber Optic Cable Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 395,000
Annual Production 3,280,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $309,111 10,792,320 kWh $0.03
Electricity Demand $231,340 23,318 kW-months/year $9.92
Electricity Fees $16,025 - $ -
Natural Gas $101,066 11,426 MMBtu $8.85
TOTAL ENERGY COSTS $657,542
RECOMMENDED SAVINGS* $118,413 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $102,813
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $ $ $
01: 4.451 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$89,630
Cost:
$5,000
$(-4,747) (-939,110) $92,536 9,327 $1,841 - - - - - - - - - $(-4,747)
(-939,110)
kWh
$92,536
9,327
kW-months/year
$1,841
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$9,148
Cost:
$21,000
$2,546 88,922 $5,902 538 - - - - $700 - - - - - $2,546
88,922
kWh
$5,902
538
kW-months/year
-
-
$
-
-
$
$700
-
$
-
-
$
-
-
$
03: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$15,600
Cost:
$1,000
- - - - - - - - - - - - $15,600 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
$15,600
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,268
Cost:
$6,500
$2,268 79,200 - - - - - - - - - - - - $2,268
79,200
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,767
Cost:
$100
$1,343 46,880 $1,324 141 - - $(-600) - - - $(-300) - - - $1,343
46,880
kWh
$1,324
141
kW-months/year
-
-
$
$(-600)
-
$
-
-
$
$(-300)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$118,413
Cost:
$33,600
$1,410 (-724,108) $99,762 10,006 $1,841 - $(-600) - $700 - $(-300) - $15,600 - $1,410
(-724,108)
kWh
$99,762
10,006
kW-months/year
$1,841
-
$
$(-600)
-
$
$700
-
$
$(-300)
-
$
$15,600
-
$
TOTAL IMPLEMENTED Savings:
$102,813
Cost:
$32,600
$1,410 (-724,108) $99,762 10,006 $1,841 - $(-600) - $700 - $(-300) - - - $1,410
(-724,108)
kWh
$99,762
10,006
kW-months/year
$1,841
-
$
$(-600)
-
$
$700
-
$
$(-300)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost By-product Production