Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2006 |
Principal Product | Monomers and oligomers |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 61,716 |
Annual Production | 30,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $349,830 | 11,051,640 | kWh | $0.03 |
Electricity Demand | $180,045 | 18,330 | kW-months/year | $9.82 |
Electricity Fees | $11,720 | - | $ | - |
Natural Gas | $902,972 | 89,466 | MMBtu | $10.09 |
TOTAL ENERGY COSTS | $1,444,567 | |||
RECOMMENDED SAVINGS* | $163,869 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,605 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $122,745 Cost: $114,000 |
- | - | - | - | $122,745 | 10,500 | - | - | - | - |
- - kWh |
- - kW-months/year |
$122,745 10,500 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,138 Cost: $10,500 |
$11,050 | 272,160 | $2,088 | 389 | - | - | - | - | - | - |
$11,050 272,160 kWh |
$2,088 389 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $12,275 Cost: $1,000 |
- | - | - | - | $12,275 | 1,050 | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,275 1,050 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $15,381 Cost: $2,000 |
- | - | - | - | $15,381 | 1,361 | - | - | - | - |
- - kWh |
- - kW-months/year |
$15,381 1,361 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $330 Cost: $100 |
$652 | 29,652 | $578 | 42 | - | - | $(-600) | - | $(-300) | - |
$652 29,652 kWh |
$578 42 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $163,869 Cost: $127,600 |
$11,702 | 301,812 | $2,666 | 431 | $150,401 | 12,911 | $(-600) | - | $(-300) | - | $11,702 301,812 kWh |
$2,666 431 kW-months/year |
$150,401 12,911 MMBtu |
$(-600) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,605 Cost: $1,100 |
$652 | 29,652 | $578 | 42 | $12,275 | 1,050 | $(-600) | - | $(-300) | - | $652 29,652 kWh |
$578 42 kW-months/year |
$12,275 1,050 MMBtu |
$(-600) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |