IAC Assessment: NC0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2006
Principal Product Monomers and oligomers
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 61,716
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $349,830 11,051,640 kWh $0.03
Electricity Demand $180,045 18,330 kW-months/year $9.82
Electricity Fees $11,720 - $ -
Natural Gas $902,972 89,466 MMBtu $10.09
TOTAL ENERGY COSTS $1,444,567
RECOMMENDED SAVINGS* $163,869 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$122,745
Cost:
$114,000
- - - - $122,745 10,500 - - - - -
-
kWh
-
-
kW-months/year
$122,745
10,500
MMBtu
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,138
Cost:
$10,500
$11,050 272,160 $2,088 389 - - - - - - $11,050
272,160
kWh
$2,088
389
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$12,275
Cost:
$1,000
- - - - $12,275 1,050 - - - - -
-
kWh
-
-
kW-months/year
$12,275
1,050
MMBtu
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,381
Cost:
$2,000
- - - - $15,381 1,361 - - - - -
-
kWh
-
-
kW-months/year
$15,381
1,361
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$330
Cost:
$100
$652 29,652 $578 42 - - $(-600) - $(-300) - $652
29,652
kWh
$578
42
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-300)
-
$
TOTAL RECOMMENDED Savings:
$163,869
Cost:
$127,600
$11,702 301,812 $2,666 431 $150,401 12,911 $(-600) - $(-300) - $11,702
301,812
kWh
$2,666
431
kW-months/year
$150,401
12,911
MMBtu
$(-600)
-
$
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$12,605
Cost:
$1,100
$652 29,652 $578 42 $12,275 1,050 $(-600) - $(-300) - $652
29,652
kWh
$578
42
kW-months/year
$12,275
1,050
MMBtu
$(-600)
-
$
$(-300)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost