IAC Assessment: NC0360
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0360
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2007
Principal Product Corrugated board
NAICS 322212 - Folding Paperboard Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 155,000
Annual Production 480,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,829 4,903,920 kWh $0.03
Electricity Demand $115,267 8,660 kW-months/year $13.31
Electricity Fees $9,302 - $ -
Natural Gas $518,813 50,229 MMBtu $10.33
TOTAL ENERGY COSTS $883,987
RECOMMENDED SAVINGS* $93,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,506
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$20,317
Cost:
$10,000
- - - - $20,317 1,840 - - - - -
-
kWh
-
-
kW-months/year
$20,317
1,840
MMBtu
-
-
$
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$9,594
Cost:
$2,250
- - - - $9,594 869 - - - - -
-
kWh
-
-
kW-months/year
$9,594
869
MMBtu
-
-
$
-
-
$
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$35,946
Cost:
$33,785
- - - - $35,946 3,256 - - - - -
-
kWh
-
-
kW-months/year
$35,946
3,256
MMBtu
-
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,267
Cost:
-
$12,267 371,713 - - - - - - - - $12,267
371,713
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,032
Cost:
$662
$577 17,486 $455 34 - - - - - - $577
17,486
kWh
$455
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,731
Cost:
$12,000
- - - - $12,731 1,153 - - - - -
-
kWh
-
-
kW-months/year
$12,731
1,153
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$836
Cost:
$300
$1,293 39,174 $1,043 78 - - $(-900) - $(-600) - $1,293
39,174
kWh
$1,043
78
kW-months/year
-
-
MMBtu
$(-900)
-
$
$(-600)
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$761
Cost:
$750
$361 10,950 $400 30 - - - - - - $361
10,950
kWh
$400
30
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$93,484
Cost:
$59,747
$14,498 439,323 $1,898 142 $78,588 7,118 $(-900) - $(-600) - $14,498
439,323
kWh
$1,898
142
kW-months/year
$78,588
7,118
MMBtu
$(-900)
-
$
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$56,506
Cost:
$25,300
$13,921 421,837 $1,443 108 $42,642 3,862 $(-900) - $(-600) - $13,921
421,837
kWh
$1,443
108
kW-months/year
$42,642
3,862
MMBtu
$(-900)
-
$
$(-600)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost