IAC logo
IAC Assessment: NC0378
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0378
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2008
Principal Product Transformers
NAICS 335311 - Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612 - Transformers, Except Electronic
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 95,000
Annual Production 40,000 Pieces
Production Hrs. Annual 8,600
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,925 7,813,750 kWh $0.03
Electricity Demand $137,436 16,301 kW-months/year $8.43
Electricity Fees $4,059 - $ -
LPG $510,566 253,903 MMBtu $2.01
TOTAL ENERGY COSTS $882,986
RECOMMENDED SAVINGS* $453,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $342,102
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Personnel Changes Administrative Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $ $ $ $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$97,991
Cost:
$50,000
$(-30,624) (-13,200,000) $(-22,202) (-2,640) - - - - $150,817 7,500 - - - - - - - - $(-30,624)
(-13,200,000)
kWh
$(-22,202)
(-2,640)
kW-months/year
-
-
$
-
-
MMBtu
$150,817
7,500
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$56,045
Cost:
$85,000
$(-38,587) (-1,663,240) $(-19,518) (-2,321) - - - - $114,150 5,676 - - - - - - - - $(-38,587)
(-1,663,240)
kWh
$(-19,518)
(-2,321)
kW-months/year
-
-
$
-
-
MMBtu
$114,150
5,676
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,480
Cost:
$500
$3,480 149,760 - - - - - - - - - - - - - - - - $3,480
149,760
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7244 REVISE SMOKE CLEANUP FROM OPERATIONS Savings:
$2,215
Cost:
$7,700
- - - - - - - - $2,215 110 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,215
110
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$17,355
Cost:
$7,450
- - - - - - - - $17,355 863 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$17,355
863
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,591
Cost:
$7,700
$1,721 74,176 $870 103 - - - - - - - - - - - - - - $1,721
74,176
kWh
$870
103
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,481
Cost:
$100
$1,591 68,591 $790 94 - - - - - - $(-600) - - - $(-300) - - - $1,591
68,591
kWh
$790
94
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$(-600)
-
$
-
-
$
$(-300)
-
$
-
-
$
08: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$226,587
Cost:
$37,500
$487 21,000 - - - - $201,100 10,000 - - - - $25,000 - - - - - $487
21,000
kWh
-
-
kW-months/year
-
-
$
$201,100
10,000
MMBtu
-
-
MMBtu
-
-
$
$25,000
-
$
-
-
$
-
-
$
09: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$10,000
Cost:
$1,000
- - - - - - - - - - - - - - - - $10,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$10,000
-
$
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$32,100
Cost:
$100,000
$32,467 - - - $(-367) - - - - - - - - - - - - - $32,467
-
kWh
-
-
kW-months/year
$(-367)
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,452
Cost:
$12,000
$1,855 79,953 $1,597 190 - - - - - - - - - - - - - - $1,855
79,953
kWh
$1,597
190
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$453,297
Cost:
$308,950
$(-27,610) (-14,469,760) $(-38,463) (-4,574) $(-367) - $201,100 10,000 $284,537 14,149 $(-600) - $25,000 - $(-300) - $10,000 - $(-27,610)
(-14,469,760)
kWh
$(-38,463)
(-4,574)
kW-months/year
$(-367)
-
$
$201,100
10,000
MMBtu
$284,537
14,149
MMBtu
$(-600)
-
$
$25,000
-
$
$(-300)
-
$
$10,000
-
$
TOTAL IMPLEMENTED Savings:
$342,102
Cost:
$108,300
$(-24,970) (-12,956,280) $(-18,945) (-2,253) - - $201,100 10,000 $150,817 7,500 $(-600) - $25,000 - $(-300) - $10,000 - $(-24,970)
(-12,956,280)
kWh
$(-18,945)
(-2,253)
kW-months/year
-
-
$
$201,100
10,000
MMBtu
$150,817
7,500
MMBtu
$(-600)
-
$
$25,000
-
$
$(-300)
-
$
$10,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Personnel Changes Administrative Changes Ancillary Material Cost By-product Production