Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2010 |
Principal Product | Transformers |
NAICS | 335311 - Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612 - Transformers, Except Electronic |
Sales | $50,000,000-$100,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 126,000 |
Annual Production | 2,500 Pieces |
Production Hrs. Annual | 5,000 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $103,174 | 1,553,845 | kWh | $0.07 |
Electricity Demand | $49,260 | 4,482 | kW-months/year | $10.99 |
Electricity Fees | $1,543 | - | $ | - |
Natural Gas | $173,727 | 20,831 | MMBtu | $8.34 |
TOTAL ENERGY COSTS | $327,704 | |||
RECOMMENDED SAVINGS* | $40,517 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,843 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $25,103 Cost: $60,000 |
- | - | - | - | $25,103 | 3,010 | - | - | - | - |
- - kWh |
- - kW-months/year |
$25,103 3,010 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2222 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING |
Savings: $9,007 Cost: $37,000 |
- | - | - | - | $9,007 | 1,080 | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,007 1,080 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,571 Cost: $11,072 |
$(-28) | (-500) | $(-20) | (-2) | $4,619 | 554 | - | - | - | - |
$(-28) (-500) kWh |
$(-20) (-2) kW-months/year |
$4,619 554 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,761 Cost: $4,346 |
$1,110 | 19,916 | $651 | 48 | - | - | - | - | - | - |
$1,110 19,916 kWh |
$651 48 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $75 Cost: $200 |
$312 | 5,600 | $183 | 13 | - | - | $(-300) | - | $(-120) | - |
$312 5,600 kWh |
$183 13 kW-months/year |
- - MMBtu |
$(-300) - $ |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,517 Cost: $112,618 |
$1,394 | 25,016 | $814 | 59 | $38,729 | 4,644 | $(-300) | - | $(-120) | - | $1,394 25,016 kWh |
$814 59 kW-months/year |
$38,729 4,644 MMBtu |
$(-300) - $ |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,843 Cost: $41,546 |
$1,422 | 25,516 | $834 | 61 | $9,007 | 1,080 | $(-300) | - | $(-120) | - | $1,422 25,516 kWh |
$834 61 kW-months/year |
$9,007 1,080 MMBtu |
$(-300) - $ |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |