Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2010 |
Principal Product | Saw blades and packaged tool accessories |
NAICS | 332216 - Saw Blade and Handtool Manufacturing |
SIC | 3425 - Saw Blades And Handsaws |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 230,000 |
Annual Production | 6,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $262,278 | 3,431,250 | kWh | $0.08 |
Electricity Demand | $31,838 | 8,420 | kW-months/year | $3.78 |
Electricity Fees | $4,586 | - | $ | - |
Natural Gas | $30,273 | 2,273 | MMBtu | $13.32 |
TOTAL ENERGY COSTS | $328,975 | |||
RECOMMENDED SAVINGS* | $31,648 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $31,648 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $4,744 Cost: $3,600 |
$1,473 | 19,901 | $301 | 201 | $2,970 | 223 | - | - | - | - |
$1,473 19,901 kWh |
$301 201 kW-months/year |
$2,970 223 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $7,833 Cost: - |
$7,112 | 96,140 | $53 | 14 | - | - | - | - | $668 | - |
$7,112 96,140 kWh |
$53 14 kW-months/year |
- - MMBtu |
- - $ |
$668 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $5,578 Cost: - |
$4,514 | 61,021 | $877 | 232 | - | - | - | - | $187 | - |
$4,514 61,021 kWh |
$877 232 kW-months/year |
- - MMBtu |
- - $ |
$187 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,940 Cost: $7,800 |
$2,538 | 34,313 | $302 | 23 | - | - | - | - | $(-900) | - |
$2,538 34,313 kWh |
$302 23 kW-months/year |
- - MMBtu |
- - $ |
$(-900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $845 Cost: $200 |
$1,656 | 22,380 | $169 | 45 | - | - | $(-800) | - | $(-180) | - |
$1,656 22,380 kWh |
$169 45 kW-months/year |
- - MMBtu |
$(-800) - $ |
$(-180) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,947 Cost: $6,200 |
- | - | - | - | $4,947 | 371 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,947 371 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $5,761 Cost: $3,750 |
$7,151 | 96,660 | - | - | - | - | - | - | $(-1,390) | - |
$7,151 96,660 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$(-1,390) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,648 Cost: $21,550 |
$24,444 | 330,415 | $1,702 | 515 | $7,917 | 594 | $(-800) | - | $(-1,615) | - | $24,444 330,415 kWh |
$1,702 515 kW-months/year |
$7,917 594 MMBtu |
$(-800) - $ |
$(-1,615) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $31,648 Cost: $21,550 |
$24,444 | 330,415 | $1,702 | 515 | $7,917 | 594 | $(-800) | - | $(-1,615) | - | $24,444 330,415 kWh |
$1,702 515 kW-months/year |
$7,917 594 MMBtu |
$(-800) - $ |
$(-1,615) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |