IAC logo
IAC Assessment: NC0401
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0401
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2010
Principal Product Saw blades and packaged tool accessories
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3425 - Saw Blades And Handsaws
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 230,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $262,278 3,431,250 kWh $0.08
Electricity Demand $31,838 8,420 kW-months/year $3.78
Electricity Fees $4,586 - $ -
Natural Gas $30,273 2,273 MMBtu $13.32
TOTAL ENERGY COSTS $328,975
RECOMMENDED SAVINGS* $31,648 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,648
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$4,744
Cost:
$3,600
$1,473 19,901 $301 201 $2,970 223 - - - - $1,473
19,901
kWh
$301
201
kW-months/year
$2,970
223
MMBtu
-
-
$
-
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$7,833
Cost:
-
$7,112 96,140 $53 14 - - - - $668 - $7,112
96,140
kWh
$53
14
kW-months/year
-
-
MMBtu
-
-
$
$668
-
$
03: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$5,578
Cost:
-
$4,514 61,021 $877 232 - - - - $187 - $4,514
61,021
kWh
$877
232
kW-months/year
-
-
MMBtu
-
-
$
$187
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,940
Cost:
$7,800
$2,538 34,313 $302 23 - - - - $(-900) - $2,538
34,313
kWh
$302
23
kW-months/year
-
-
MMBtu
-
-
$
$(-900)
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$845
Cost:
$200
$1,656 22,380 $169 45 - - $(-800) - $(-180) - $1,656
22,380
kWh
$169
45
kW-months/year
-
-
MMBtu
$(-800)
-
$
$(-180)
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,947
Cost:
$6,200
- - - - $4,947 371 - - - - -
-
kWh
-
-
kW-months/year
$4,947
371
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,761
Cost:
$3,750
$7,151 96,660 - - - - - - $(-1,390) - $7,151
96,660
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$(-1,390)
-
$
TOTAL RECOMMENDED Savings:
$31,648
Cost:
$21,550
$24,444 330,415 $1,702 515 $7,917 594 $(-800) - $(-1,615) - $24,444
330,415
kWh
$1,702
515
kW-months/year
$7,917
594
MMBtu
$(-800)
-
$
$(-1,615)
-
$
TOTAL IMPLEMENTED Savings:
$31,648
Cost:
$21,550
$24,444 330,415 $1,702 515 $7,917 594 $(-800) - $(-1,615) - $24,444
330,415
kWh
$1,702
515
kW-months/year
$7,917
594
MMBtu
$(-800)
-
$
$(-1,615)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost