Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2010 |
Principal Product | Paints and stains |
NAICS | 325510 - Paint and Coating Manufacturing |
SIC | 2851 - Paints And Allied Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 59 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 5,000,000 Pounds |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $27,990 | 617,200 | kWh | $0.05 |
Electricity Demand | $9,629 | 1,754 | kW-months/year | $5.49 |
Natural Gas | $52,788 | 4,290 | MMBtu | $12.30 |
TOTAL ENERGY COSTS | $90,407 | |||
RECOMMENDED SAVINGS* | $33,644 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,127 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $227 Cost: $200 |
$634 | 12,085 | $133 | 24 | - | - | $(-300) | - | $(-240) | - |
$634 12,085 kWh |
$133 24 kW-months/year |
- - gal |
$(-300) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $900 Cost: $100 |
$747 | 14,248 | $153 | 28 | - | - | - | - | - | - |
$747 14,248 kWh |
$153 28 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,096 Cost: $4,858 |
$834 | 15,902 | $262 | 48 | - | - | - | - | - | - |
$834 15,902 kWh |
$262 48 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5142 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS |
Savings: $31,421 Cost: - |
$(-9,146) | (-174,400) | $(-2,872) | (-523) | $43,439 | 34,751 | - | - | - | - |
$(-9,146) (-174,400) kWh |
$(-2,872) (-523) kW-months/year |
$43,439 34,751 gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,644 Cost: $5,158 |
$(-6,931) | (-132,165) | $(-2,324) | (-423) | $43,439 | 34,751 | $(-300) | - | $(-240) | - | $(-6,931) (-132,165) kWh |
$(-2,324) (-423) kW-months/year |
$43,439 34,751 gal |
$(-300) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,127 Cost: $300 |
$1,381 | 26,333 | $286 | 52 | - | - | $(-300) | - | $(-240) | - | $1,381 26,333 kWh |
$286 52 kW-months/year |
- - gal |
$(-300) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost |