Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2011 |
Principal Product | Airplane seats |
NAICS | 336360 - Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 2531 - Public Building & Related Furniture |
Sales | $100,000,000-$500,000,000 |
# of Employees | 164 |
Plant Area (Sq.Ft.) | 97,000 |
Annual Production | 5,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $65,515 | 1,322,080 | kWh | $0.05 |
Electricity Demand | $16,431 | 4,290 | kW-months/year | $3.83 |
Electricity Fees | $6,004 | - | $ | - |
Natural Gas | $10,525 | 741 | MMBtu | $14.20 |
TOTAL ENERGY COSTS | $98,475 | |||
RECOMMENDED SAVINGS* | $3,728 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,516 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $967 Cost: $25 |
$967 | 19,500 | - | - | - | - | - | - | - | - |
$967 19,500 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,212 Cost: $2,582 |
- | - | - | - | $1,212 | 85 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,212 85 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $174 Cost: $50 |
$148 | 2,985 | $26 | 7 | - | - | - | - | - | - |
$148 2,985 kWh |
$26 7 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $363 Cost: $100 |
$487 | 9,818 | $86 | 22 | - | - | $(-120) | - | $(-90) | - |
$487 9,818 kWh |
$86 22 kW-months/year |
- - MMBtu |
$(-120) - $ |
$(-90) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $873 Cost: $50 |
$667 | 13,440 | $206 | 54 | - | - | - | - | - | - |
$667 13,440 kWh |
$206 54 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $139 Cost: $517 |
$139 | 2,812 | - | - | - | - | - | - | - | - |
$139 2,812 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $3,728 Cost: $3,324 |
$2,408 | 48,555 | $318 | 83 | $1,212 | 85 | $(-120) | - | $(-90) | - | $2,408 48,555 kWh |
$318 83 kW-months/year |
$1,212 85 MMBtu |
$(-120) - $ |
$(-90) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,516 Cost: $742 |
$2,408 | 48,555 | $318 | 83 | - | - | $(-120) | - | $(-90) | - | $2,408 48,555 kWh |
$318 83 kW-months/year |
- - MMBtu |
$(-120) - $ |
$(-90) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |