Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2011 |
Principal Product | Adhesive tapes |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 3,000,000 Thousand Feet |
Production Hrs. Annual | 6,600 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $562,711 | 16,415,070 | kWh | $0.03 |
Electricity Demand | $227,955 | 47,598 | kW-months/year | $4.79 |
Electricity Fees | $240 | - | $ | - |
Natural Gas | $1,395,224 | 166,044 | MMBtu | $8.40 |
TOTAL ENERGY COSTS | $2,186,130 | |||
RECOMMENDED SAVINGS* | $75,601 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,079 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $28,591 Cost: $51,300 |
- | - | - | - | $26,541 | 3,160 | - | - | - | - | $2,050 | - |
- - kWh |
- - kW-months/year |
$26,541 3,160 MMBtu |
- - $ |
- - $ |
$2,050 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $9,751 Cost: $25,000 |
- | - | - | - | $9,571 | 1,139 | - | - | - | - | $180 | - |
- - kWh |
- - kW-months/year |
$9,571 1,139 MMBtu |
- - $ |
- - $ |
$180 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $12,484 Cost: $5,500 |
- | - | - | - | $16,584 | 1,974 | $(-500) | - | $(-3,600) | - | - | - |
- - kWh |
- - kW-months/year |
$16,584 1,974 MMBtu |
$(-500) - $ |
$(-3,600) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $10,180 Cost: $25,000 |
- | - | - | - | $10,180 | 1,211 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,180 1,211 MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,844 Cost: $100 |
$4,828 | 130,166 | $856 | 179 | - | - | $(-600) | - | $(-240) | - | - | - |
$4,828 130,166 kWh |
$856 179 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-240) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $9,751 Cost: $20,768 |
$7,897 | 212,908 | $1,854 | 387 | - | - | - | - | - | - | - | - |
$7,897 212,908 kWh |
$1,854 387 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,601 Cost: $127,668 |
$12,725 | 343,074 | $2,710 | 566 | $62,876 | 7,484 | $(-1,100) | - | $(-3,840) | - | $2,230 | - | $12,725 343,074 kWh |
$2,710 566 kW-months/year |
$62,876 7,484 MMBtu |
$(-1,100) - $ |
$(-3,840) - $ |
$2,230 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,079 Cost: $26,368 |
$12,725 | 343,074 | $2,710 | 566 | $16,584 | 1,974 | $(-1,100) | - | $(-3,840) | - | - | - | $12,725 343,074 kWh |
$2,710 566 kW-months/year |
$16,584 1,974 MMBtu |
$(-1,100) - $ |
$(-3,840) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption |