IAC Assessment: NC0429
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0429
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2011
Principal Product Heavy duty transmissions
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 250,000
Annual Production 10,000 Pieces
Production Hrs. Annual 4,250
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $785,136 22,540,800 kWh $0.03
Electricity Demand $369,317 40,632 kW-months/year $9.09
Electricity Fees $3,387 - $ -
Natural Gas $298,189 48,537 MMBtu $6.14
TOTAL ENERGY COSTS $1,456,029
RECOMMENDED SAVINGS* $55,947 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,733
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$27,312
Cost:
-
$19,895 570,200 $7,417 816 - - - - $19,895
570,200
kWh
$7,417
816
kW-months/year
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$21,573
Cost:
$45,000
$6,255 179,588 $15,318 1,685 - - - - $6,255
179,588
kWh
$15,318
1,685
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,733
Cost:
$100
$2,603 74,727 $970 107 $(-600) - $(-240) - $2,603
74,727
kWh
$970
107
kW-months/year
$(-600)
-
$
$(-240)
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,499
Cost:
$5,803
$3,566 102,391 $(-67) (-7) - - - - $3,566
102,391
kWh
$(-67)
(-7)
kW-months/year
-
-
$
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$830
Cost:
$2,077
$478 13,710 $352 39 - - - - $478
13,710
kWh
$352
39
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,947
Cost:
$52,980
$32,797 940,616 $23,990 2,640 $(-600) - $(-240) - $32,797
940,616
kWh
$23,990
2,640
kW-months/year
$(-600)
-
$
$(-240)
-
$
TOTAL IMPLEMENTED Savings:
$2,733
Cost:
$100
$2,603 74,727 $970 107 $(-600) - $(-240) - $2,603
74,727
kWh
$970
107
kW-months/year
$(-600)
-
$
$(-240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost