IAC logo
IAC Assessment: NC0438
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0438
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2011
Principal Product Pharmceutical Rubber
NAICS 325212 - Synthetic Rubber Manufacturing
SIC 2822 - Synthetic Rubber
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 172,682
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,036,858 15,187,614 kWh $0.07
Electricity Demand $217,855 9,505 kW-months/year $22.92
Electricity Fees $84,356 - $ -
Natural Gas $564,948 86,494 MMBtu $6.53
TOTAL ENERGY COSTS $1,966,225
RECOMMENDED SAVINGS* $162,602 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,612
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $ $ $
01: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$62,448
Cost:
$94,000
- - - - $143,448 21,978 $(-81,000) (-17,802) - - - - - - -
-
kWh
-
-
kW-months/year
$143,448
21,978
MMBtu
$(-81,000)
(-17,802)
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$8,972
Cost:
$7,800
- - - - $8,972 1,374 - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,972
1,374
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT Savings:
$19,068
Cost:
$32,000
$18,335 268,560 $12,307 536 $(-11,574) (-1,800) - - - - - - - - $18,335
268,560
kWh
$12,307
536
kW-months/year
$(-11,574)
(-1,800)
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$19,936
Cost:
$5,500
- - - - $23,116 3,540 - - - - $(-300) - $(-2,880) - -
-
kWh
-
-
kW-months/year
$23,116
3,540
MMBtu
-
-
MMBtu
-
-
Tgal
$(-300)
-
$
$(-2,880)
-
$
05: 3.4141 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE Savings:
$43,023
Cost:
$92,800
$(-1,081) (-15,840) $(-1,816) (-79) - - - - $25,920 6,480,000 - - $20,000 - $(-1,081)
(-15,840)
kWh
$(-1,816)
(-79)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$25,920
6,480,000
Tgal
-
-
$
$20,000
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,515
Cost:
$5,548
$3,300 48,331 $2,215 97 - - - - - - - - - - $3,300
48,331
kWh
$2,215
97
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,224
Cost:
$300
$1,833 26,856 $1,231 54 - - - - - - $(-600) - $(-240) - $1,833
26,856
kWh
$1,231
54
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$(-600)
-
$
$(-240)
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,416
Cost:
$2,112
$1,416 20,736 - - - - - - - - - - - - $1,416
20,736
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$162,602
Cost:
$240,060
$23,803 348,643 $13,937 608 $163,962 25,092 $(-81,000) (-17,802) $25,920 6,480,000 $(-900) - $16,880 - $23,803
348,643
kWh
$13,937
608
kW-months/year
$163,962
25,092
MMBtu
$(-81,000)
(-17,802)
MMBtu
$25,920
6,480,000
Tgal
$(-900)
-
$
$16,880
-
$
TOTAL IMPLEMENTED Savings:
$12,612
Cost:
$10,212
$3,249 47,592 $1,231 54 $8,972 1,374 - - - - $(-600) - $(-240) - $3,249
47,592
kWh
$1,231
54
kW-months/year
$8,972
1,374
MMBtu
-
-
MMBtu
-
-
Tgal
$(-600)
-
$
$(-240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Energy Water Disposal Personnel Changes Ancillary Material Cost