Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2015 |
Principal Product | Extruded plastics |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 111,327 |
Annual Production | 2,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $394,353 | 9,622,800 | kWh | $0.04 |
Electricity Demand | $285,963 | 16,951 | kW-months/year | $16.87 |
Natural Gas | $33,725 | 3,782 | MMBtu | $8.92 |
TOTAL ENERGY COSTS | $714,041 | |||
RECOMMENDED SAVINGS* | $43,804 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,507 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,085 Cost: $12,500 |
$5,085 | 124,030 | - | - | - | - | - | - | - | - |
$5,085 124,030 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $10,751 Cost: $8,568 |
$10,751 | 262,208 | - | - | - | - | - | - | - | - |
$10,751 262,208 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,597 Cost: $4,400 |
- | - | - | - | $1,597 | 179 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,597 179 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,465 Cost: $12,000 |
- | - | - | - | $8,465 | 949 | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,465 949 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $3,916 Cost: $4,500 |
- | - | - | - | $3,916 | 439 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,916 439 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,384 Cost: $100 |
$4,019 | 98,024 | $2,265 | 134 | - | - | $(-600) | - | $(-300) | - |
$4,019 98,024 kWh |
$2,265 134 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $5,043 Cost: $9,000 |
$2,371 | 57,834 | $2,672 | 158 | - | - | - | - | - | - |
$2,371 57,834 kWh |
$2,672 158 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $147 Cost: $150 |
$147 | 3,594 | - | - | - | - | - | - | - | - |
$147 3,594 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $587 Cost: $100 |
$345 | 8,410 | $194 | 12 | - | - | - | - | $48 | - |
$345 8,410 kWh |
$194 12 kW-months/year |
- - MMBtu |
- - $ |
$48 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,829 Cost: $4,258 |
$1,809 | 44,123 | $1,020 | 60 | - | - | - | - | - | - |
$1,809 44,123 kWh |
$1,020 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,804 Cost: $55,576 |
$24,527 | 598,223 | $6,151 | 364 | $13,978 | 1,567 | $(-600) | - | $(-252) | - | $24,527 598,223 kWh |
$6,151 364 kW-months/year |
$13,978 1,567 MMBtu |
$(-600) - $ |
$(-252) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,507 Cost: $33,408 |
$11,060 | 269,771 | $3,285 | 194 | $10,062 | 1,128 | $(-600) | - | $(-300) | - | $11,060 269,771 kWh |
$3,285 194 kW-months/year |
$10,062 1,128 MMBtu |
$(-600) - $ |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |