IAC logo
IAC Assessment: NC0607
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0607
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Furniture
NAICS 337127 - Institutional Furniture Manufacturing
SIC 2521 - Wood Office Furniture
Sales $50,000,000-$100,000,000
# of Employees 294
Plant Area (Sq.Ft.) 280,000
Annual Production 88,625 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,858 1,538,651 kWh $0.06
Electricity Demand $33,156 7,418 kW-months/year $4.47
Natural Gas $77,832 5,520 MMBtu $14.10
TOTAL ENERGY COSTS $204,846
RECOMMENDED SAVINGS* $6,948 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,948
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Wood Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$436
Cost:
$797
$436 7,644 - - - - - - - - $436
7,644
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$805
Cost:
$1,000
$547 9,600 $258 58 - - - - - - $547
9,600
kWh
$258
58
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$487
Cost:
$200
$467 8,200 $220 49 - - $(-100) - $(-100) - $467
8,200
kWh
$220
49
kW-months/year
-
-
MMBtu
$(-100)
-
$
$(-100)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,655
Cost:
$10,125
$3,655 64,125 - - - - - - - - $3,655
64,125
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$468
Cost:
$1,500
- - - - $468 187 - - - - -
-
kWh
-
-
kW-months/year
$468
187
MMBtu
-
-
$
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,097
Cost:
$5,865
$746 13,086 $351 78 - - - - - - $746
13,086
kWh
$351
78
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$6,948
Cost:
$19,487
$5,851 102,655 $829 185 $468 187 $(-100) - $(-100) - $5,851
102,655
kWh
$829
185
kW-months/year
$468
187
MMBtu
$(-100)
-
$
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$6,948
Cost:
$19,487
$5,851 102,655 $829 185 $468 187 $(-100) - $(-100) - $5,851
102,655
kWh
$829
185
kW-months/year
$468
187
MMBtu
$(-100)
-
$
$(-100)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Wood Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Wood Personnel Changes Ancillary Material Cost