IAC logo
IAC Assessment: NC0618
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0618
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Chemicals
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 45,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,840 986,988 kWh $0.05
Electricity Demand $16,051 2,067 kW-months/year $7.77
Natural Gas $33,838 5,402 MMBtu $6.26
TOTAL ENERGY COSTS $121,879
RECOMMENDED SAVINGS* $256,014 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ %
01: 2.2615 CLEAN CONDENSER TUBES Savings:
$226,480
Cost:
$50,000
- - - - - - $(-30,000) - $256,480 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$(-30,000)
-
$
$256,480
-
%
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$909
Cost:
$750
$708 12,960 $201 26 - - - - - - $708
12,960
kWh
$201
26
kW-months/year
-
-
Tgal
-
-
$
-
-
%
03: 2.4154 AVOID REWINDING MOTORS MORE THAN TWICE Savings:
$2,752
Cost:
$5,685
$2,143 39,257 $609 78 - - - - - - $2,143
39,257
kWh
$609
78
kW-months/year
-
-
Tgal
-
-
$
-
-
%
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$12,341
Cost:
$2,450
- - - - $12,461 1,030 $(-120) - - - -
-
kWh
-
-
kW-months/year
$12,461
1,030
Tgal
$(-120)
-
$
-
-
%
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$10,360
Cost:
-
$8,063 147,676 $2,297 295 - - - - - - $8,063
147,676
kWh
$2,297
295
kW-months/year
-
-
Tgal
-
-
$
-
-
%
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,172
Cost:
$500
$3,172 - - - - - - - - - $3,172
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$256,014
Cost:
$59,385
$14,086 199,893 $3,107 399 $12,461 1,030 $(-30,120) - $256,480 - $14,086
199,893
kWh
$3,107
399
kW-months/year
$12,461
1,030
Tgal
$(-30,120)
-
$
$256,480
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ %
Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Increase in Production